Gas pipelines in Poland
This list ranks all 49 gas pipelines tracked in Poland by capacity, including operating, under-construction, planned, shelved and retired projects. 36 of them are operating, with a combined capacity of 8.10 bcm/y.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Yamal-Europe Gas PipelineTver | Gas pipeline | 33.0 bcm/y | Idled | 1999 |
| 2 | Baltic Pipe Project | Gas pipeline | 10.0 bcm/y | 2022 | |
| 3 | Kobryn-Brest-Warsaw Gas Pipeline | Gas pipeline | 10.0 bcm/y | 1985 | |
| 4 | Poland-Slovakia Gas PipelineSubcarpathian Voivodoship | Gas pipeline | 5.70 bcm/y | 2022 | |
| 5 | Gas Interconnection Poland-Lithuania | Gas pipeline | 2.40 bcm/y | 2022 | |
| 6 | Volkovysk–Gosgranitza Gas Pipeline | Gas pipeline | 2.00 bcm/y | 1974 | |
| 7 | Baltic Pipe ProjectLubusz | Gas pipeline | 2022 | ||
| 8 | Baltic Pipe ProjectPomerania | Gas pipeline | 2022 | ||
| 9 | Bonikowo–Lwowek Gas Pipeline | Gas pipeline | |||
| 10 | Czech-Polish Interconnector Gas Pipeline (CPI) | Gas pipeline | Proposed | 2022 | |
| 11 | Czeszów-Kiełczów Gas Pipeline | Gas pipeline | 2018 | ||
| 12 | Goleniow–Gdynia Gas Pipeline | Gas pipeline | |||
| 13 | Goleniów–Płoty Gas Pipeline | Gas pipeline | 2022 | ||
| 14 | Goleniow–Szczecin Gas Pipeline | Gas pipeline | |||
| 15 | Gustorzyn-Wronów Gas Pipeline | Gas pipeline | 2023 | ||
| 16 | Hermanowice-Jaroslaw Pipeline | Gas pipeline | Proposed | 2029 | |
| 17 | Hermanowice-Strachocina Pipeline | Gas pipeline | 2020 | ||
| 18 | Holowczyce–Pulawy Gas Pipeline | Gas pipeline | |||
| 19 | Jaroslaw-Rozwadów Pipeline | Gas pipeline | Proposed | 2029 | |
| 20 | Kędzierzyn-Racibórz Gas Pipeline | Gas pipeline | 2025 | ||
| 21 | Lasow–Odolanow Gas Pipeline | Gas pipeline | |||
| 22 | Lewin Brzeski-Nysa PipelineOpolskie Voivodeship | Gas pipeline | Proposed | 2020 | |
| 23 | Lwówek-Odlonów Gas Pipeline | Gas pipeline | 2019 | ||
| 24 | Odolanow-Latynia Gas Pipeline | Gas pipeline | |||
| 25 | Odolanow–Husow Gas Pipeline | Gas pipeline | |||
| 26 | Oświęcim-Tworzen Gas Pipeline | Gas pipeline | 2025 | ||
| 27 | Oswiecim–Pogorska Wola Gas Pipeline | Gas pipeline | |||
| 28 | Pelczyce-Poznan Gas Pipeline | Gas pipeline | |||
| 29 | Pogórska-Wola-Tworzen Gas Pipeline | Gas pipeline | 2022 | ||
| 30 | Poznan-Krobia Gas Pipeline | Gas pipeline | |||
| 31 | Racibórz–Oświęcim Gas Pipeline | Gas pipeline | Construction | 2026 | |
| 32 | Rembelszczyzna-Mory Gas Pipeline | Gas pipeline | 2025 | ||
| 33 | Rembelszczyzna-Wronów Gas Pipeline | Gas pipeline | Proposed | 2029 | |
| 34 | Rozwadów-Końskowola-Wronów Pipeline | Gas pipeline | Proposed | 2029 | |
| 35 | Rozwadów-Strachocina Gas Pipeline | Gas pipeline | Proposed | 2030 | |
| 36 | Skoczów-Komorowice-Oświęcim Gas Pipeline | Gas pipeline | Proposed | ||
| 37 | Stalowa Wola-Pogorska Wola Gas Pipeline | Gas pipeline | |||
| 38 | Strachocina-Pogórska-Wola Gas Pipeline | Gas pipeline | 2021 | ||
| 39 | Swinoujscie–Goleniow Gas Pipeline | Gas pipeline | |||
| 40 | Szczecin - Lwówek to Dolna Odra Gas Pipeline | Gas pipeline | 2023 | ||
| 41 | Tworóg-Tworzen Gas Pipeline | Gas pipeline | 2021 | ||
| 42 | Tworórog-Kędzierzyn Gas Pipeline | Gas pipeline | 2020 | ||
| 43 | Tworzen–Cieszyn Gas Pipeline | Gas pipeline | |||
| 44 | Wloclawek–Gdynia Gas Pipeline | Gas pipeline | |||
| 45 | Wloclawek–Odolanow Gas Pipeline | Gas pipeline | |||
| 46 | Wloclawek–Rembelszczyzna Gas Pipeline | Gas pipeline | |||
| 47 | Wronow–Husow Gas Pipeline | Gas pipeline | |||
| 48 | Wronow–Jaroslaw Gas Pipeline | Gas pipeline | |||
| 49 | Zdzieszowice-Wrocław Gas Pipeline | Gas pipeline | 2021 |