Oil & NGL pipelines in Norway
This list ranks all 9 oil & ngl pipelines tracked in Norway by capacity, including operating, under-construction, planned, shelved and retired projects. 9 of them are operating, with a combined capacity of 3,064,000 boe/d.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Norpipe Oil Pipeline | Oil pipeline | 830,000 boe/d | 1975 | |
| 2 | Oseberg Transport System | Oil pipeline | 765,000 boe/d | 1988 | |
| 3 | Johan Svedrup Oil Pipeline | Oil pipeline | 755,000 boe/d | 2019 | |
| 4 | Troll Oil Pipeline | Oil pipeline | 500,000 boe/d | 1995 | |
| 5 | Grane Oil Pipeline | Oil pipeline | 214,000 boe/d | 2003 | |
| 6 | Edvard Grieg Pipeline | Oil pipeline | 2015 | ||
| 7 | Gjøa Oil Pipeline | Oil pipeline | 2010 | ||
| 8 | Kvitebjørn Oil Pipeline | Oil pipeline | 2004 | ||
| 9 | Vestprosess | Oil pipeline | 1999 |