Oil & NGL pipelines in Lithuania
This list ranks all 2 oil & ngl pipelines tracked in Lithuania by capacity, including operating, under-construction, planned, shelved and retired projects. 1 of them are operating, with a combined capacity of 242,000 boe/d.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Druzhba Oil Pipeline | Oil pipeline | 321,315 boe/d | Mothballed | 1971 |
| 2 | Mazeikiai-Butinge Oil Pipeline | Oil pipeline | 242,000 boe/d |