Global Energy Monitor tracks 229 energy facilities in Jordan, including power plants with 7.09 GW of operating generating capacity.
Jordan's energy system at a glance
Jordan has 7.09 GW of operating power generation capacity across 213 plants in the Global Energy Monitor dataset. Oil & gas is the largest source, with 4.65 GW or 66% of the total. It is followed by solar (25%) and wind (8.8%).
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 34% of operating capacity, while coal, oil and gas account for 66%. Wind and solar alone represent 34%.
Another 3.48 GW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 6 gas pipeline projects (about 674 km in operation), 2 LNG terminals (3.8 mtpa import capacity in operation) and 1 oil and gas fields (1 producing) in Jordan.
Operating power capacity by technology
- Oil & gas 4.65 GW 66%
- Solar 1.80 GW 25%
- Wind 621 MW 8.8%
- Bioenergy 13 MW 0.2%
| Technology | Operating | Plants operating | Under construction | Planned |
|---|---|---|---|---|
| Oil & gas | 4.65 GW | 12 | — | 1.30 GW |
| Solar | 1.80 GW | 192 | — | 730 MW |
| Wind | 621 MW | 8 | — | 1.00 GW |
| Bioenergy | 13 MW | 1 | — | — |
| Hydropower | — | 0 | — | 450 MW |
Largest power plants in Jordan
| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Samra power plantZarqa | Oil & gas | 1.24 GW | 2006 | |
| 2 | Masdar-Jordan wind farm | Wind | 1.00 GW | Announced | |
| 3 | IPP8 Combined Cycle Power StationMaan | Oil & gas | 700 MW | Pre-construction | 2028 |
| 4 | Green Prosperity solar farmMaan | Solar | 600 MW | Shelved | |
| 5 | North Jordan power stationIrbid | Oil & gas | 600 MW | Pre-construction | 2027 |
| 6 | IPP3 ICE power plantThe Capital | Oil & gas | 574 MW | 2014 | |
| 7 | Aqaba Special Economic Zone solar farm | Solar | 530 MW | Pre-construction | 2029 |
| 8 | Zarqa power plantZarqa | Oil & gas | 485 MW | 2018 | |
| 9 | Attarat power plantThe Capital | Oil & gas | 470 MW | 2021 | |
| 10 | Al-Mujib Dam Pumped Storage hydroelectric plantMadaba | Hydropower | 450 MW | Pre-construction | 2030 |
Pipeline: capacity under construction
Gas & oil power plants in Jordan
See all 14 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Samra power plantZarqa | Oil & gas | 1.24 GW | 2006 | |
| 2 | IPP8 Combined Cycle Power StationMaan | Oil & gas | 700 MW | Pre-construction | 2028 |
| 3 | North Jordan power stationIrbid | Oil & gas | 600 MW | Pre-construction | 2027 |
| 4 | IPP3 ICE power plantThe Capital | Oil & gas | 574 MW | 2014 | |
| 5 | Zarqa power plantZarqa | Oil & gas | 485 MW | 2018 |
Hydropower plants in Jordan
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Al-Mujib Dam Pumped Storage hydroelectric plantMadaba | Hydropower | 450 MW | Pre-construction | 2030 |
Wind farms in Jordan
See all 9 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Masdar-Jordan wind farm | Wind | 1.00 GW | Announced | |
| 2 | Tafilah wind farmTafilah | Wind | 117 MW | 2017 | |
| 3 | Tafilah Mass wind farmTafilah Governorate | Wind | 100 MW | 2020 | |
| 4 | Fujeij wind farmTafilah | Wind | 89 MW | 2019 | |
| 5 | Al-Rajef wind farmMaan | Wind | 86 MW | 2018 |
Solar farms in Jordan
See all 195 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Green Prosperity solar farmMaan | Solar | 600 MW | Shelved | |
| 2 | Aqaba Special Economic Zone solar farm | Solar | 530 MW | Pre-construction | 2029 |
| 3 | Baynouna Solar PlantAmman | Solar | 200 MW | 2020 | |
| 4 | Jordan 200 MW PV solar farm | Solar | 200 MW | Announced | |
| 5 | Quweira Solar PV PlantAqaba | Solar | 103 MW | 2018 |
Bioenergy power plants in Jordan
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | As-Samra Biogas power stationMafraq | Bioenergy | 13 MW | 2008 |
Gas pipelines in Jordan
See all 6 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Israel Natural Gas Transmission System | Gas pipeline | 15.0 bcm/y | 2011 | |
| 2 | Arab Gas PipelineAqaba | Gas pipeline | 10.3 bcm/y | 2005 | |
| 3 | Arab Gas Pipeline | Gas pipeline | 10.3 bcm/y | 2008 | |
| 4 | Arab Gas PipelineSouth Sinai | Gas pipeline | 10.3 bcm/y | 2003 | |
| 5 | Arab Gas Pipeline | Gas pipeline | 10.3 bcm/y | 2007 |
Oil & NGL pipelines in Jordan
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | BasraâAqaba Oil PipelineAqaba | Oil pipeline | 2,250,000 boe/d | Proposed | |
| 2 | Trans-Arabian Oil Pipeline | Oil pipeline | 500,000 boe/d | Retired | 1950 |
LNG terminals in Jordan
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Sheikh Sabah LNG Terminal | LNG import terminal | 5.48 mtpa | Proposed | |
| 2 | Aqaba Jordan FSRUAqaba | LNG import terminal | 3.80 mtpa | 2015 |
Oil & gas fields in Jordan
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Risha Gas Field (Jordan) | Oil & gas field | 1989 |
Frequently asked questions
How much power generation capacity does Jordan have?
Global Energy Monitor tracks 7.09 GW of operating power plant capacity in Jordan, counting plants of all technologies above the trackers' size thresholds.
What is the largest power plant in Jordan?
The largest power plant in Jordan in the dataset is Samra power plant, a 1.24 GW oil & gas plant.
What share of Jordan's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 34% of operating power capacity in Jordan. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does Jordan have nuclear power plants?
No operating nuclear power plant is recorded in Jordan in the dataset.
Does Jordan have LNG terminals?
Yes. The dataset lists 2 LNG terminal projects in Jordan. Operating import capacity: 3.8 mtpa.
Energy news from Jordan
Excelerate Energy Signs 11-Year LNG Deal With AxDo to Anchor Bahamas Import Hub
Antares Nuclear Signs Second TRISO Fuel Deal With BWXT Ahead of 2027 Mark-1 Startup
Saudi Arabia Intercepts More Houthi Missiles as Riyadh Reels From Deadliest Attack in Over a Decade
ACWA Power: Ownership, Leadership and Projects