#NameTypeCapacityStatusStart
1Gazela PipelineÚstí nad Labem RegionGas pipeline30.0 bcm/yOperating2013
2Kateřinský Potok Junction Point–Přimda Junction Point Gas PipelineGas pipeline27.5 bcm/yOperating2021
3Bidirectional Austrian-Czech Interconnector Gas Pipeline (BACI)Gas pipeline6.50 bcm/yShelved2026
4Czech-Polish Interconnector Gas Pipeline (CPI)Gas pipelineProposed2022
5Dobré Pole–Namest nad Oslavou Gas PipelineGas pipelineOperating
6Hospozin–Dobré Pole Gas PipelineGas pipelineOperating
7Hospozin–Rozvadov Gas PipelineGas pipelineOperating
8Hostim–Malesovice Gas PipelineGas pipelineOperating
9Jirkov–Hospozin Gas PipelineGas pipelineOperating
10Malesovice–Brodské Gas PipelineGas pipelineOperating
11Malesovice–Oslavou Gas PipelineGas pipelineOperating
12Rozvadov–Veseli Nad Luznici Gas PipelineGas pipelineOperating
13Veseli Nad Luznici–Hostim Gas PipelineGas pipelineOperating