Gas pipelines in Czech Republic
This list ranks all 13 gas pipelines tracked in Czech Republic by capacity, including operating, under-construction, planned, shelved and retired projects. 11 of them are operating, with a combined capacity of 57.5 bcm/y.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Gazela PipelineÚstí nad Labem Region | Gas pipeline | 30.0 bcm/y | 2013 | |
| 2 | Kateřinský Potok Junction Point–Přimda Junction Point Gas Pipeline | Gas pipeline | 27.5 bcm/y | 2021 | |
| 3 | Bidirectional Austrian-Czech Interconnector Gas Pipeline (BACI) | Gas pipeline | 6.50 bcm/y | Shelved | 2026 |
| 4 | Czech-Polish Interconnector Gas Pipeline (CPI) | Gas pipeline | Proposed | 2022 | |
| 5 | Dobré Pole–Namest nad Oslavou Gas Pipeline | Gas pipeline | |||
| 6 | Hospozin–Dobré Pole Gas Pipeline | Gas pipeline | |||
| 7 | Hospozin–Rozvadov Gas Pipeline | Gas pipeline | |||
| 8 | Hostim–Malesovice Gas Pipeline | Gas pipeline | |||
| 9 | Jirkov–Hospozin Gas Pipeline | Gas pipeline | |||
| 10 | Malesovice–Brodské Gas Pipeline | Gas pipeline | |||
| 11 | Malesovice–Oslavou Gas Pipeline | Gas pipeline | |||
| 12 | Rozvadov–Veseli Nad Luznici Gas Pipeline | Gas pipeline | |||
| 13 | Veseli Nad Luznici–Hostim Gas Pipeline | Gas pipeline |