Country profile
Cameroon energy infrastructure
Global Energy Monitor tracks 38 energy facilities in Cameroon, including power plants with 1.95 GW of operating generating capacity.
Cameroon's energy system at a glance
Cameroon has 1.95 GW of operating power generation capacity across 15 plants in the Global Energy Monitor dataset. Hydropower is the largest source, with 1.41 GW or 72% of the total. It is followed by oil & gas (19%) and wind (5.1%).
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 81% of operating capacity, while coal, oil and gas account for 19%. Wind and solar alone represent 9.1%.
Another 5.74 GW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 2 LNG terminals (2.4 mtpa export capacity in operation) and 3 oil and gas fields (2 producing) in Cameroon.
Operating power capacity by technology
- Hydropower 1.41 GW 72%
- Oil & gas 364 MW 19%
- Wind 100 MW 5.1%
- Solar 77 MW 4%
| Technology | Operating | Plants operating | Under construction | Planned |
|---|---|---|---|---|
| Hydropower | 1.41 GW | 6 | — | 2.83 GW |
| Oil & gas | 364 MW | 3 | — | 850 MW |
| Wind | 100 MW | 1 | — | 1.04 GW |
| Solar | 77 MW | 5 | — | 1.02 GW |
Largest power plants in Cameroon
| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Grand Eweng hydroelectric plantLittoral | Hydropower | 1.80 GW | Pre-construction | 2028 |
| 2 | Infinity Power (Cameroon) solar farms | Solar | 1.00 GW | Announced | 2035 |
| 3 | Infinity Power (Cameroon) wind farms | Wind | 1.00 GW | Announced | |
| 4 | Chollet hydroelectric plantEast Province | Hydropower | 600 MW | Announced | 2031 |
| 5 | Nachtigal hydroelectric plantCentre | Hydropower | 420 MW | 2025 | |
| 6 | Song Loulou hydroelectric plantLittoral | Hydropower | 396 MW | 1981 | |
| 7 | Bekoko power stationLittoral | Oil & gas | 350 MW | Announced | |
| 8 | Limbé power stationSouth-West | Oil & gas | 350 MW | Pre-construction | 2029 |
| 9 | Kpep hydroelectric plantNorthwest | Hydropower | 283 MW | Pre-construction | |
| 10 | Edea hydroelectric plantLittoral | Hydropower | 276 MW | 1953 |
Pipeline: capacity under construction
Gas & oil power plants in Cameroon
See all 6 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Bekoko power stationLittoral | Oil & gas | 350 MW | Announced | |
| 2 | Limbé power stationSouth-West | Oil & gas | 350 MW | Pre-construction | 2029 |
| 3 | Kribi power stationSouth | Oil & gas | 216 MW | 2013 | |
| 4 | Douala power stationLittoral | Oil & gas | 150 MW | Announced | |
| 5 | Dibabmba power stationLittoral | Oil & gas | 88 MW | 2009 |
Hydropower plants in Cameroon
See all 12 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Grand Eweng hydroelectric plantLittoral | Hydropower | 1.80 GW | Pre-construction | 2028 |
| 2 | Chollet hydroelectric plantEast Province | Hydropower | 600 MW | Announced | 2031 |
| 3 | Nachtigal hydroelectric plantCentre | Hydropower | 420 MW | 2025 | |
| 4 | Song Loulou hydroelectric plantLittoral | Hydropower | 396 MW | 1981 | |
| 5 | Kpep hydroelectric plantNorthwest | Hydropower | 283 MW | Pre-construction |
Wind farms in Cameroon
See all 3 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Infinity Power (Cameroon) wind farms | Wind | 1.00 GW | Announced | |
| 2 | Cameroon wind farm | Wind | 100 MW | ||
| 3 | Bamboutos Mountains wind farm | Wind | 40 MW | Announced |
Solar farms in Cameroon
See all 8 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Infinity Power (Cameroon) solar farms | Solar | 1.00 GW | Announced | 2035 |
| 2 | Garoua solar farmNorth | Solar | 30 MW | 2023 | |
| 3 | Lagdo solar farmNorth | Solar | 20 MW | Shelved | |
| 4 | Ngaoundéré solar farm | Solar | 20 MW | Announced | |
| 5 | Guider solar farm | Solar | 18 MW | 2023 |
Oil & NGL pipelines in Cameroon
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | ChadâCameroon Oil Pipeline | Oil pipeline | 225,000 boe/d | 2003 |
LNG terminals in Cameroon
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Cameroon FLNG TerminalOcéan | LNG export terminal | 2.40 mtpa | 2018 | |
| 2 | Etinde FLNG Terminal | LNG export terminal | 1.30 mtpa | Proposed |
Oil & gas fields in Cameroon
See all 3 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Logbaba Oil and Gas Field (Cameroon) | Oil & gas field | 0.32 million boe/y | 2011 | |
| 2 | Njonji Oil Field (Cameroon) | Oil & gas field | Discovered | ||
| 3 | Padouk Oil and Gas Field (Cameroon) | Oil & gas field | 2014 |
Frequently asked questions
How much power generation capacity does Cameroon have?
Global Energy Monitor tracks 1.95 GW of operating power plant capacity in Cameroon, counting plants of all technologies above the trackers' size thresholds.
What share of Cameroon's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 81% of operating power capacity in Cameroon. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does Cameroon have nuclear power plants?
No operating nuclear power plant is recorded in Cameroon in the dataset.
Does Cameroon have LNG terminals?
Yes. The dataset lists 2 LNG terminal projects in Cameroon. Operating export capacity: 2.4 mtpa.
