Global Energy Monitor tracks 219 energy facilities in Bosnia and Herzegovina, including power plants with 4.93 GW of operating generating capacity. A further 550 MW is under construction and 5.28 GW is in planning stages.
Bosnia and Herzegovina's energy system at a glance
Bosnia and Herzegovina has 4.93 GW of operating power generation capacity across 100 plants in the Global Energy Monitor dataset. Hydropower is the largest source, with 2.16 GW or 44% of the total. It is followed by coal (40%) and solar (11%).
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 60% of operating capacity, while coal, oil and gas account for 40%. Wind and solar alone represent 16%.
A further 550 MW of generating capacity is under construction, led by solar (200 MW). Another 5.28 GW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 4 gas pipeline projects and 15 coal mines in Bosnia and Herzegovina.
Delići, Peljave-Tobut, and Baljak Coal MinesRepublika Srpska
Coal mine
0.90 million tonnes coal/y
Proposed
Frequently asked questions
How much power generation capacity does Bosnia and Herzegovina have?
Global Energy Monitor tracks 4.93 GW of operating power plant capacity in Bosnia and Herzegovina, counting plants of all technologies above the trackers' size thresholds.
What share of Bosnia and Herzegovina's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 60% of operating power capacity in Bosnia and Herzegovina. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does Bosnia and Herzegovina have nuclear power plants?
No operating nuclear power plant is recorded in Bosnia and Herzegovina in the dataset.