Gas pipelines in Bangladesh (page 2)
This list ranks all 60 gas pipelines tracked in Bangladesh by capacity, including operating, under-construction, planned, shelved and retired projects. 47 of them are operating, with a combined capacity of 160 bcm/y.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 51 | 2nd Bangabandhu Railway Bridge Gas Transmission Pipeline | Gas pipeline | Construction | 2025 | |
| 52 | Bakhrabad-Meghnaghat-Haripur Gas Transmission Pipeline | Gas pipeline | Construction | 2024 | |
| 53 | Bhola–Khulna Gas Pipeline | Gas pipeline | Shelved | ||
| 54 | Bhomra-Khulna Transmission Pipeline | Gas pipeline | Proposed | ||
| 55 | India-Myanmar-Bangladesh Gas Pipeline | Gas pipeline | Proposed | ||
| 56 | Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project | Gas pipeline | Shelved | 2035 | |
| 57 | Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline | Gas pipeline | Shelved | 2029 | |
| 58 | Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline | Gas pipeline | Proposed | 2025 | |
| 59 | Shahbazpur-Bhola-Laharhut-Barishal Gas Transmission Pipeline | Gas pipeline | Proposed | 2025 | |
| 60 | Tekerhat-Faridpur and Tekerhat-Barishal Gas Transmission Pipeline Project | Gas pipeline | Shelved | 2029 |