Gas pipelines in Austria
This list ranks all 18 gas pipelines tracked in Austria by capacity, including operating, under-construction, planned, shelved and retired projects. 14 of them are operating, with a combined capacity of 71.3 bcm/y.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Trans-Austria Gas PipelineLower Austria | Gas pipeline | 13.7 bcm/y | 2007 | |
| 2 | Trans-Austria Gas PipelineLower Austria | Gas pipeline | 13.7 bcm/y | 1974 | |
| 3 | Trans-Austria Gas PipelineLower Austria | Gas pipeline | 13.7 bcm/y | ||
| 4 | West Austria Gas PipelineLower Austria | Gas pipeline | 10.9 bcm/y | 1980 | |
| 5 | West Austria Gas PipelineLower Austria | Gas pipeline | 10.9 bcm/y | 1980 | |
| 6 | Bidirectional Austrian-Czech Interconnector Gas Pipeline (BACI) | Gas pipeline | 6.50 bcm/y | Shelved | 2026 |
| 7 | Hungary-Austria Interconnector Gas PipelineLower Austria | Gas pipeline | 4.26 bcm/y | 1996 | |
| 8 | Hungary-Austria Interconnector Gas Pipeline | Gas pipeline | 4.26 bcm/y | 1996 | |
| 9 | West Austria Gas PipelineUpper Austria | Gas pipeline | 2.50 bcm/y | Proposed | 2027 |
| 10 | Auerstal-Kronstorf Gas Pipeline | Gas pipeline | 2014 | ||
| 11 | Austria–Slovenia Interconnector (SOL) Gas Pipeline | Gas pipeline | Proposed | 2028 | |
| 12 | Austria–Slovenia Interconnector (SOL) Gas Pipeline | Gas pipeline | 1978 | ||
| 13 | Gänserndorf-Simmering Gas PipelineLower Austria | Gas pipeline | 2011 | ||
| 14 | Hoscht-St.Magrethen Gas Pipeline | Gas pipeline | |||
| 15 | Lanzhot–Plavecky Peter Gas Pipeline | Gas pipeline | |||
| 16 | Lindau-Daleu Gas Pipeline | Gas pipeline | |||
| 17 | Penta-West Gas Pipeline | Gas pipeline | 1999 | ||
| 18 | Rankweil-Lienz Gas Pipeline | Gas pipeline |