Coal · China

Yaomeng power station

Yaomeng power station is a 1.84 GW coal-fired power station located in Henan, China. The facility is currently in operation, with its first unit entering service in 1985.

1.84 GWCapacity
OperatingStatus
1985Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 6 units or phases at this site (operating 1.84 GW, shelved / mothballed 320 MW, retired 320 MW).

Technology: subcritical, supercritical; fuel: coal: bituminous.

Ownership: Pingdingshan Yaomeng Electric POWER Co Ltd (parent company: China National Coal Group; China Power International Development Co Ltd).

Its 4 operating units were commissioned between 1985 and 2007. 1 units have already been retired (2017).

Why it matters

  • At a typical capacity factor of 50% for this technology, it would generate roughly 8.1 TWh of electricity a year (indicative estimate).

Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.

Coal power in China

China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.

The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.

Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).

See the full list: Coal power plants in China →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Phase I Unit 1 320 MW Retired subcritical 1975 2017
Phase I Unit 2 320 MW Mothballed subcritical 1980
Phase I Unit 3 320 MW Operating subcritical 1985
Phase I Unit 4 320 MW Operating subcritical 1986
Phase II Unit 1 600 MW Operating supercritical 2007
Phase II Unit 2 600 MW Operating supercritical 2007

How coal power plants work

A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.

Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.

Technology at Yaomeng power station

Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Yaomeng power station is located in Henan, China, at approximately 33.7380, 113.2419. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Yaomeng power station is owned by Pingdingshan Yaomeng Electric POWER Co Ltd. The ultimate parent company is China National Coal Group; China Power International Development Co Ltd. Across the dataset, China National Coal Group is linked to 26 power plants with 18.7 GW of operating capacity.

Frequently asked questions

What is the capacity of Yaomeng power station?

Yaomeng power station has a capacity of 1.84 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.

What type of facility is Yaomeng power station?

Yaomeng power station is a coal-fired power station. Supercritical units operate above the critical pressure of water, reaching efficiencies of roughly 38–42% and lower emissions per megawatt-hour than subcritical units.

Who owns Yaomeng power station?

Yaomeng power station is owned by Pingdingshan Yaomeng Electric POWER Co Ltd. The ultimate parent company is China National Coal Group; China Power International Development Co Ltd.

Where is Yaomeng power station located?

It is located in Henan, China. Approximate coordinates: 33.7380, 113.2419.

Is Yaomeng power station operational?

According to the latest data, Yaomeng power station is in operation. Operating means the facility is built and in commercial service.

When did Yaomeng power station start operating?

Start year: 1985. Current status: Operating. Its 4 operating units were commissioned between 1985 and 2007. 1 units have already been retired (2017).

How much electricity does Yaomeng power station generate?

Actual output data are not published for every plant. As an indicative estimate, Yaomeng power station would produce about 8.1 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.

How big is Yaomeng power station compared with other facilities in China?

Yaomeng power station ranks #216 by capacity among 1188 comparable coal facilities tracked in China.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.