Solar · China

Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm

Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm is a 1.30 GW solar power plant located in Xinjiang, China. The facility is currently in operation, with its first unit entering service in 2025.

1.30 GWCapacity
OperatingStatus
2025Start year
View on the interactive map →

Overview

Technology: PV.

Ownership: PetroChina Tarim Oilfield Co.

Why it matters

  • Ranks #37 worldwide among solar facilities of the same status group by capacity.
  • At a typical capacity factor of 20% for this technology, it would generate roughly 2.3 TWh of electricity a year (indicative estimate).

Utility-scale solar produces electricity during daylight hours; its value to the grid increasingly depends on storage and transmission connections.

Solar power in China

China has 614.6 GW of operating solar capacity across 12,875 plants in the Global Energy Monitor dataset — 20% of the country's total operating power capacity of 3,086.2 GW.

The solar pipeline in China includes 238.6 GW under construction and 467.2 GW at earlier planning stages.

Other major solar plants in China include Qinghai Hainan Clean Energy Transmission Base solar farm (9.60 GW), Shanxi Datong Mined-Out Areas Megabase solar farms (5.00 GW) and Xinjiang Hoboksar "Paramilitary-Civil" Cooperation solar farm (4.60 GW).

See the full list: Solar farms in China →

How solar farms work

Most utility-scale solar plants use photovoltaic (PV) panels that convert sunlight directly into direct current, which inverters turn into alternating current for the grid. A smaller number of concentrated solar power (CSP) plants use mirrors to focus sunlight and heat a fluid that drives a steam turbine.

Solar output follows the daily and seasonal path of the sun, giving typical capacity factors of 15–30% depending on latitude and whether panels track the sun. Its costs have fallen by around 90% over the past decade, making it the fastest-growing power source worldwide; pairing plants with batteries shifts part of their output into the evening peak.

Technology at Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm

The plant uses photovoltaic (PV) panels, which convert sunlight directly into electricity.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm is located in Xinjiang, China, at approximately 41.7230, 86.2640. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm is owned by PetroChina Tarim Oilfield Co. Across the dataset, PetroChina Tarim Oilfield Co is linked to 2 power plants with 1.90 GW of operating capacity.

Frequently asked questions

What is the capacity of Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm?

Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm has a capacity of 1.30 GW according to the latest Global Energy Monitor data.

What type of facility is Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm?

Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm is a solar power plant. The plant uses photovoltaic (PV) panels, which convert sunlight directly into electricity.

Who owns Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm?

Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm is owned by PetroChina Tarim Oilfield Co.

Where is Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm located?

It is located in Xinjiang, China. Approximate coordinates: 41.7230, 86.2640.

Is Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm operational?

According to the latest data, Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm is in operation. Operating means the facility is built and in commercial service.

When did Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm start operating?

Start year: 2025. Current status: Operating.

How much electricity does Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm generate?

Actual output data are not published for every plant. As an indicative estimate, Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm would produce about 2.3 TWh a year, assuming a capacity factor of 20%, which is typical for this technology.

How big is Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm compared with other facilities in China?

Xinjiang Korla Shangku High Technology Zone (Tarim Oilfield) solar farm ranks #28 by capacity among 12875 comparable solar facilities tracked in China.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.