Overview
Global Energy Monitor tracks 3 units or phases at this site (operating 1.60 GW).
Technology: Onshore.
Ownership: Changji Gurbantünggüt Desert Base New Energy Development CO LTD Huadian Mori Branch CO Co Ltd.
Why it matters
- The 11th-largest wind farm in China by capacity (of 4869 operating wind facilities tracked).
- Ranks #13 worldwide among wind facilities of the same status group by capacity.
- At a typical capacity factor of 30% for this technology, it would generate roughly 4.2 TWh of electricity a year (indicative estimate).
Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.
Wind power in China
China has 542.8 GW of operating wind capacity across 4,869 plants in the Global Energy Monitor dataset — 18% of the country's total operating power capacity of 3,086.2 GW.
The wind pipeline in China includes 214.3 GW under construction and 467.6 GW at earlier planning stages.
Other major wind plants in China include Qinghai Hainan Clean Energy Transmission Base wind farm (6.00 GW), Gansu - Shandong Power Export Huanxian (Huaneng) Wind/Solar Demonstration Project wind farm (4.50 GW) and Xinjiang - Chongqing Power Export wind farms (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| China Coal | 400 MW | Onshore | 2025 | ||
| Huadian | 800 MW | Onshore | 2025 | ||
| Shaanxi Investment | 400 MW | Onshore | 2025 |
How wind farms work
A wind farm is a group of wind turbines whose rotors turn a generator, either directly or through a gearbox. Modern onshore turbines are typically rated at 3–7 MW each and offshore turbines at 8–15 MW; power is collected through an internal cable network and fed into the grid at a substation.
Output rises steeply with wind speed, so location matters more than for almost any other technology. Onshore wind farms usually reach capacity factors of 25–40% and offshore farms 40–50%. Because generation is variable, wind relies on strong transmission links, storage and flexible plants to balance supply and demand.
Technology at Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms
This is an onshore wind farm, built on land.
Location
Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms is located in Xinjiang, China, at approximately 44.2530, 90.2480. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms is owned by Changji Gurbantünggüt Desert Base New Energy Development CO LTD Huadian Mori Branch CO Co Ltd. Across the dataset, Changji Gurbantünggüt Desert Base New Energy Development CO LTD Huadian Mori Branch CO Co Ltd is linked to 2 power plants with 2.10 GW of operating capacity.
Frequently asked questions
What is the capacity of Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms?
Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms has a capacity of 1.60 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.
What type of facility is Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms?
Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms is a wind farm. This is an onshore wind farm, built on land.
Who owns Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms?
Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms is owned by Changji Gurbantünggüt Desert Base New Energy Development CO LTD Huadian Mori Branch CO Co Ltd.
Where is Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms located?
It is located in Xinjiang, China. Approximate coordinates: 44.2530, 90.2480.
Is Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms operational?
According to the latest data, Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms is in operation. Operating means the facility is built and in commercial service.
When did Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms start operating?
Start year: 2025. Current status: Operating.
How much electricity does Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms generate?
Actual output data are not published for every plant. As an indicative estimate, Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms would produce about 4.2 TWh a year, assuming a capacity factor of 30%, which is typical for this technology.
How big is Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms compared with other facilities in China?
Xinjiang Gurbantünggüt Desert Renewables Base Mori wind farms ranks #11 by capacity among 4869 comparable wind facilities tracked in China.