Overview
Global Energy Monitor tracks 5 units or phases at this site (operating 1.12 GW, planned 1.12 GW, retired 558 MW).
Technology: subcritical, steam turbine; fuel: coal: subbituminous, natural gas.
Ownership: Southwestern Electric Power Co (parent company: American Electric Power Company Inc).
Its 2 operating units were commissioned between 1977 and 1982. 2 further units or phases are scheduled to come online in 2027. 1 units have already been retired (2016). 2 operating units have a planned retirement date, the earliest in 2028.
Why it matters
- At a typical capacity factor of 40% for this technology, it would generate roughly 3.9 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in United States
United States has 590.9 GW of operating oil & gas capacity across 1,106 plants in the Global Energy Monitor dataset — 46% of the country's total operating power capacity of 1,280.9 GW.
The oil & gas pipeline in United States includes 29.4 GW under construction and 257.6 GW at earlier planning stages.
Other major oil & gas plants in United States include West County energy center (4.26 GW), Bruce Mansfield power station (3.64 GW) and Crystal River Energy Complex (3.45 GW).
See the full list: Gas & oil power plants in United States →
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1, timepoint 1 | 558 MW | subcritical | 1977 | 2028 | |
| Unit 1, timepoint 2 | 558 MW | Pre-construction | steam turbine | 2027 | |
| Unit 2 | 558 MW | Retired | subcritical | 1980 | 2016 |
| Unit 3, timepoint 1 | 558 MW | subcritical | 1982 | 2028 | |
| Unit 3, timepoint 2 | 558 MW | Pre-construction | steam turbine | 2027 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Welsh Power Plant
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity. Steam-turbine units burn fuel in a boiler to raise steam; they are generally older and less flexible than combined-cycle plants.
Location
Welsh Power Plant is located in Texas, United States, at approximately 33.0552, -94.8403. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Welsh Power Plant is owned by Southwestern Electric Power Co. The ultimate parent company is American Electric Power Company Inc. Across the dataset, American Electric Power Company Inc is linked to 37 power plants with 22.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Welsh Power Plant?
Welsh Power Plant has a capacity of 1.12 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.
What type of facility is Welsh Power Plant?
Welsh Power Plant is a oil- and gas-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Welsh Power Plant?
Welsh Power Plant is owned by Southwestern Electric Power Co. The ultimate parent company is American Electric Power Company Inc.
Where is Welsh Power Plant located?
It is located in Texas, United States. Approximate coordinates: 33.0552, -94.8403.
Is Welsh Power Plant operational?
According to the latest data, Welsh Power Plant is in operation. Operating means the facility is built and in commercial service.
When did Welsh Power Plant start operating?
Start year: 1977. Current status: Operating. Its 2 operating units were commissioned between 1977 and 1982. 2 further units or phases are scheduled to come online in 2027. 1 units have already been retired (2016). 2 operating units have a planned retirement date, the earliest in 2028.
How much electricity does Welsh Power Plant generate?
Actual output data are not published for every plant. As an indicative estimate, Welsh Power Plant would produce about 3.9 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Welsh Power Plant compared with other facilities in United States?
Welsh Power Plant ranks #135 by capacity among 1106 comparable oil & gas facilities tracked in United States.