Global Energy Monitor tracks 9 units or phases at this site (operating 2.52 GW, planned 1.50 GW).
Technology: unknown, subcritical, ultra-supercritical; fuel: LNG, coal: anthracite, coal: bituminous, coal: unknown.
Ownership: Vung Ang-3 Thermal (parent company: Samsung Corp).
Its 4 operating units were commissioned between 2014 and 2026. 1 further units or phases are scheduled to come online in 2035.
Why it matters
- The 2nd-largest oil- and gas-fired power station in Vietnam by capacity (of 12 operating oil & gas facilities tracked).
- Provides about 20% of Vietnam's operating oil & gas capacity and roughly 3.1% of all operating power capacity in the country in the dataset.
- Ranks #83 worldwide among oil & gas facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 8.8 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Vietnam
Vietnam has 12.7 GW of operating oil & gas capacity across 12 plants in the Global Energy Monitor dataset — 16% of the country's total operating power capacity of 80.0 GW.
The oil & gas pipeline in Vietnam includes 13.7 GW under construction and 30.4 GW at earlier planning stages.
Other major oil & gas plants in Vietnam include Haiphong LNG power station (4.80 GW), Quang Trach Power Center (4.40 GW) and Nhon Trach power station (2.84 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 3-CC1 | 1.50 GW | Pre-construction | unknown | 2035 | |
| Phase 1 Unit 1 | 600 MW | subcritical | 2014 | ||
| Phase 1 Unit 2 | 600 MW | subcritical | 2015 | ||
| Phase 2 Unit 1 | 660 MW | ultra-supercritical | 2025 | ||
| Phase 2 Unit 2 | 660 MW | ultra-supercritical | 2026 | ||
| Phase 3 Unit 1 | 600 MW | Cancelled | unknown | ||
| Phase 3 Unit 2 | 600 MW | Cancelled | unknown | ||
| Phase 3 Unit 3 | 600 MW | Cancelled | unknown | ||
| Phase 3 Unit 4 | 600 MW | Cancelled | unknown |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Vung Ang power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Vung Ang power station is located in Hà Tĩnh, Vietnam, at approximately 18.0979, 106.3812. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Vung Ang power station is owned by Vung Ang-3 Thermal. The ultimate parent company is Samsung Corp.
Frequently asked questions
What is the capacity of Vung Ang power station?
Vung Ang power station has a capacity of 2.52 GW according to the latest Global Energy Monitor data. This figure covers the 9 units or phases listed for the site.
What type of facility is Vung Ang power station?
Vung Ang power station is a oil- and gas-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Vung Ang power station?
Vung Ang power station is owned by Vung Ang-3 Thermal. The ultimate parent company is Samsung Corp.
Where is Vung Ang power station located?
It is located in Hà Tĩnh, Vietnam. Approximate coordinates: 18.0979, 106.3812.
Is Vung Ang power station operational?
According to the latest data, Vung Ang power station is in operation. Operating means the facility is built and in commercial service.
When did Vung Ang power station start operating?
Start year: 2014. Current status: Operating. Its 4 operating units were commissioned between 2014 and 2026. 1 further units or phases are scheduled to come online in 2035.
How much electricity does Vung Ang power station generate?
Actual output data are not published for every plant. As an indicative estimate, Vung Ang power station would produce about 8.8 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Vung Ang power station compared with other facilities in Vietnam?
Vung Ang power station ranks #2 by capacity among 12 comparable oil & gas facilities tracked in Vietnam.