Overview
Global Energy Monitor tracks 4 units or phases at this site (operating 1.32 GW, under construction 1.32 GW).
Technology: supercritical, ultra-supercritical; fuel: coal: bituminous.
Ownership: Shanxi Zhangzhe POWER Tonhua Generation Co Ltd (parent company: Jinneng Holding Shanxi Electric Power Co Ltd; Shanxi State-Owned Capital Investment and Operation Co Ltd; Jinneng Group Co Ltd; unknown; Jinneng Holding Group…).
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 5.8 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in China
China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.
The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.
Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 660 MW | supercritical | 2010 | ||
| Phase I Unit 2 | 660 MW | supercritical | 2010 | ||
| Phase II Unit 3 | 660 MW | Construction | ultra-supercritical | ||
| Phase II Unit 4 | 660 MW | Construction | ultra-supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Tonghua Xuangang power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Location
Tonghua Xuangang power station is located in Shanxi, China, at approximately 38.9151, 112.4766. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Tonghua Xuangang power station is owned by Shanxi Zhangzhe POWER Tonhua Generation Co Ltd. The ultimate parent company is Jinneng Holding Shanxi Electric Power Co Ltd; Shanxi State-Owned Capital Investment and Operation Co Ltd; Jinneng Group Co Ltd; unknown; Jinneng Holding Group Co Ltd. Across the dataset, Jinneng Holding Shanxi Electric Power Co Ltd is linked to 15 power plants with 12.1 GW of operating capacity.
Frequently asked questions
What is the capacity of Tonghua Xuangang power station?
Tonghua Xuangang power station has a capacity of 1.32 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Tonghua Xuangang power station?
Tonghua Xuangang power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Tonghua Xuangang power station?
Tonghua Xuangang power station is owned by Shanxi Zhangzhe POWER Tonhua Generation Co Ltd. The ultimate parent company is Jinneng Holding Shanxi Electric Power Co Ltd; Shanxi State-Owned Capital Investment and Operation Co Ltd; Jinneng Group Co Ltd; unknown; Jinneng Holding Group Co Ltd.
Where is Tonghua Xuangang power station located?
It is located in Shanxi, China. Approximate coordinates: 38.9151, 112.4766.
Is Tonghua Xuangang power station operational?
According to the latest data, Tonghua Xuangang power station is in operation. Operating means the facility is built and in commercial service.
When did Tonghua Xuangang power station start operating?
Start year: 2010. Current status: Operating.
How much electricity does Tonghua Xuangang power station generate?
Actual output data are not published for every plant. As an indicative estimate, Tonghua Xuangang power station would produce about 5.8 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Tonghua Xuangang power station compared with other facilities in China?
Tonghua Xuangang power station ranks #261 by capacity among 1188 comparable coal facilities tracked in China.