Overview
Technology: conventional storage.
Ownership: China Anneng Construction Group Co Ltd; China Southern Power Grid Peak Shaving and Frequency Modulation Power Generation Co Ltd.
Why it matters
- At a typical capacity factor of 40% for this technology, it would generate roughly 4.6 TWh of electricity a year (indicative estimate).
Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.
Hydropower power in China
China has 372.5 GW of operating hydropower capacity across 1,006 plants in the Global Energy Monitor dataset — 12% of the country's total operating power capacity of 3,086.2 GW.
The hydropower pipeline in China includes 241.1 GW under construction and 321.5 GW at earlier planning stages.
Other major hydropower plants in China include Motuo hydroelectric plant (60.0 GW), Three Gorges Dam hydroelectric plant (22.5 GW) and Baihetan hydroelectric plant (16.0 GW).
How hydropower plants work
Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.
Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.
Technology at Tianshengqiao Stage 2 hydroelectric plant
Its reservoir allows water to be stored and power to be dispatched when it is most needed.
Location
Tianshengqiao Stage 2 hydroelectric plant is located in Guangxi, China, at approximately 24.9670, 105.1566. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Tianshengqiao Stage 2 hydroelectric plant is owned by China Anneng Construction Group Co Ltd; China Southern Power Grid Peak Shaving and Frequency Modulation Power Generation Co Ltd. Across the dataset, China Anneng Construction Group Co Ltd is linked to 4 power plants with 2.28 GW of operating capacity.
Frequently asked questions
What is the capacity of Tianshengqiao Stage 2 hydroelectric plant?
Tianshengqiao Stage 2 hydroelectric plant has a capacity of 1.32 GW according to the latest Global Energy Monitor data.
What type of facility is Tianshengqiao Stage 2 hydroelectric plant?
Tianshengqiao Stage 2 hydroelectric plant is a hydropower plant. Its reservoir allows water to be stored and power to be dispatched when it is most needed.
Who owns Tianshengqiao Stage 2 hydroelectric plant?
Tianshengqiao Stage 2 hydroelectric plant is owned by China Anneng Construction Group Co Ltd; China Southern Power Grid Peak Shaving and Frequency Modulation Power Generation Co Ltd.
Where is Tianshengqiao Stage 2 hydroelectric plant located?
It is located in Guangxi, China. Approximate coordinates: 24.9670, 105.1566.
Is Tianshengqiao Stage 2 hydroelectric plant operational?
According to the latest data, Tianshengqiao Stage 2 hydroelectric plant is in operation. Operating means the facility is built and in commercial service.
When did Tianshengqiao Stage 2 hydroelectric plant start operating?
Start year: 2000. Current status: Operating.
How much electricity does Tianshengqiao Stage 2 hydroelectric plant generate?
Actual output data are not published for every plant. As an indicative estimate, Tianshengqiao Stage 2 hydroelectric plant would produce about 4.6 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Tianshengqiao Stage 2 hydroelectric plant compared with other facilities in China?
Tianshengqiao Stage 2 hydroelectric plant ranks #64 by capacity among 1006 comparable hydropower facilities tracked in China.