Overview
Technology: pumped storage.
Ownership: Snowy Hydro Ltd.
Why it matters
- The largest hydropower plant in Australia by capacity, out of 62 operating, under-construction and planned hydropower facilities tracked in the country.
- If completed, it would add 2.00 GW to Australia's hydropower fleet — equivalent to 24% of today's operating hydropower capacity.
Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.
Hydropower power in Australia
Australia has 8.20 GW of operating hydropower capacity across 42 plants in the Global Energy Monitor dataset — 10% of the country's total operating power capacity of 79.3 GW.
The hydropower pipeline in Australia includes 2.25 GW under construction and 12.9 GW at earlier planning stages.
Other major hydropower plants in Australia include Tumut 3 hydroelectric plant (1.80 GW).
How hydropower plants work
Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.
Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.
Technology at Snowy 2.0 hydroelectric plant
As a pumped-storage scheme it pumps water to an upper reservoir when power is cheap and releases it through turbines at peak times, acting as a large grid-scale battery.
Location
Snowy 2.0 hydroelectric plant is located in New South Wales, Australia, at approximately -35.7452, 148.6536. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Snowy 2.0 hydroelectric plant is owned by Snowy Hydro Ltd. Across the dataset, Snowy Hydro Ltd is linked to 14 power plants with 5.51 GW of operating capacity.
Frequently asked questions
What is the capacity of Snowy 2.0 hydroelectric plant?
Snowy 2.0 hydroelectric plant has a capacity of 2.00 GW according to the latest Global Energy Monitor data.
What type of facility is Snowy 2.0 hydroelectric plant?
Snowy 2.0 hydroelectric plant is a hydropower plant. As a pumped-storage scheme it pumps water to an upper reservoir when power is cheap and releases it through turbines at peak times, acting as a large grid-scale battery.
Who owns Snowy 2.0 hydroelectric plant?
Snowy 2.0 hydroelectric plant is owned by Snowy Hydro Ltd.
Where is Snowy 2.0 hydroelectric plant located?
It is located in New South Wales, Australia. Approximate coordinates: -35.7452, 148.6536.
Is Snowy 2.0 hydroelectric plant operational?
According to the latest data, Snowy 2.0 hydroelectric plant is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Snowy 2.0 hydroelectric plant expected to start?
Start year: 2028. Current status: Construction.
How big is Snowy 2.0 hydroelectric plant compared with other facilities in Australia?
Snowy 2.0 hydroelectric plant ranks #1 by capacity among 62 comparable hydropower facilities tracked in Australia.