Overview
Technology: Offshore hard mount.
Why it matters
- The 20th-largest wind farm in China by capacity (of 4869 operating wind facilities tracked).
- Ranks #28 worldwide among wind facilities of the same status group by capacity.
- At a typical capacity factor of 42% for this technology, it would generate roughly 3.7 TWh of electricity a year (indicative estimate).
Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.
Wind power in China
China has 542.8 GW of operating wind capacity across 4,869 plants in the Global Energy Monitor dataset — 18% of the country's total operating power capacity of 3,086.2 GW.
The wind pipeline in China includes 214.3 GW under construction and 467.6 GW at earlier planning stages.
Other major wind plants in China include Qinghai Hainan Clean Energy Transmission Base wind farm (6.00 GW), Gansu - Shandong Power Export Huanxian (Huaneng) Wind/Solar Demonstration Project wind farm (4.50 GW) and Xinjiang - Chongqing Power Export wind farms (4.20 GW).
How wind farms work
A wind farm is a group of wind turbines whose rotors turn a generator, either directly or through a gearbox. Modern onshore turbines are typically rated at 3–7 MW each and offshore turbines at 8–15 MW; power is collected through an internal cable network and fed into the grid at a substation.
Output rises steeply with wind speed, so location matters more than for almost any other technology. Onshore wind farms usually reach capacity factors of 25–40% and offshore farms 40–50%. Because generation is variable, wind relies on strong transmission links, storage and flexible plants to balance supply and demand.
Technology at Shandong Guohua Kenli Offshore wind farm
Offshore turbines benefit from stronger and steadier winds at sea, giving higher capacity factors than most onshore sites.
Location
Shandong Guohua Kenli Offshore wind farm is located in Shandong, China, at approximately 37.6642, 119.0790. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Frequently asked questions
What is the capacity of Shandong Guohua Kenli Offshore wind farm?
Shandong Guohua Kenli Offshore wind farm has a capacity of 1.00 GW according to the latest Global Energy Monitor data.
What type of facility is Shandong Guohua Kenli Offshore wind farm?
Shandong Guohua Kenli Offshore wind farm is a wind farm. Offshore turbines benefit from stronger and steadier winds at sea, giving higher capacity factors than most onshore sites.
Where is Shandong Guohua Kenli Offshore wind farm located?
It is located in Shandong, China. Approximate coordinates: 37.6642, 119.0790.
Is Shandong Guohua Kenli Offshore wind farm operational?
According to the latest data, Shandong Guohua Kenli Offshore wind farm is in operation. Operating means the facility is built and in commercial service.
When did Shandong Guohua Kenli Offshore wind farm start operating?
Start year: 2025. Current status: Operating.
How much electricity does Shandong Guohua Kenli Offshore wind farm generate?
Actual output data are not published for every plant. As an indicative estimate, Shandong Guohua Kenli Offshore wind farm would produce about 3.7 TWh a year, assuming a capacity factor of 42%, which is typical for this technology.
How big is Shandong Guohua Kenli Offshore wind farm compared with other facilities in China?
Shandong Guohua Kenli Offshore wind farm ranks #20 by capacity among 4869 comparable wind facilities tracked in China.
Nearby energy infrastructure
- Shandong Weifang Alkaline Shoreline solar farm
- Guohua Shouguang power station
- Shandong Dongying Kenli (China Resources) solar farm
- Shandong Dongying Kenli (Guohua HG14) Offshore solar project
- Datang Dongying power station
- Shandong Lubei Saline-Alkali Tidal Flat solar project
- Shengli Dongying power station
- Shandong Lijin Huiyang Clean Energy Fishery solar farm