Overview
Global Energy Monitor tracks 20 units or phases at this site (operating 1.60 GW, shelved / mothballed 400 MW).
Technology: subcritical; fuel: coal: lignite.
Ownership: Pukchang Thermal Plant Complex.
Its 16 operating units were commissioned between 1972 and 2018.
Why it matters
- The largest coal-fired power station in North Korea by capacity, out of 7 operating coal facilities tracked in the country.
- Provides about 49% of North Korea's operating coal capacity and roughly 25% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 50% for this technology, it would generate roughly 7.0 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in North Korea
North Korea has 3.25 GW of operating coal capacity across 7 plants in the Global Energy Monitor dataset — 50% of the country's total operating power capacity of 6.52 GW.
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 100 MW | Mothballed | subcritical | 1971 | |
| Unit 2 | 100 MW | Mothballed | subcritical | 1971 | |
| Unit 3 | 100 MW | Mothballed | subcritical | 1971 | |
| Unit 4 | 100 MW | Mothballed | subcritical | 1972 | |
| Unit 5 | 100 MW | subcritical | 1972 | ||
| Unit 6 | 100 MW | subcritical | 1972 | ||
| Unit 7 | 100 MW | subcritical | 1975 | ||
| Unit 8 | 100 MW | subcritical | 1975 | ||
| Unit 9 | 100 MW | subcritical | 1975 | ||
| Unit 10 | 100 MW | subcritical | 1975 | ||
| Unit 11 | 100 MW | subcritical | 1975 | ||
| Unit 12 | 100 MW | subcritical | 1975 | ||
| Unit 13 | 100 MW | subcritical | 1984 | ||
| Unit 14 | 100 MW | subcritical | 1984 | ||
| Unit 15 | 100 MW | subcritical | 1984 | ||
| Unit 16 | 100 MW | subcritical | 1984 | ||
| Unit 17 | 100 MW | subcritical | 2018 | ||
| Unit 18 | 100 MW | subcritical | 2018 | ||
| Unit 19 | 100 MW | subcritical | 2018 | ||
| Unit 20 | 100 MW | subcritical | 2018 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Pukchang power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Pukchang power station is located in South Pyongan, North Korea, at approximately 39.5861, 126.3051. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Pukchang power station is owned by Pukchang Thermal Plant Complex.
Frequently asked questions
What is the capacity of Pukchang power station?
Pukchang power station has a capacity of 1.60 GW according to the latest Global Energy Monitor data. This figure covers the 20 units or phases listed for the site.
What type of facility is Pukchang power station?
Pukchang power station is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Pukchang power station?
Pukchang power station is owned by Pukchang Thermal Plant Complex.
Where is Pukchang power station located?
It is located in South Pyongan, North Korea. Approximate coordinates: 39.5861, 126.3051.
Is Pukchang power station operational?
According to the latest data, Pukchang power station is in operation. Operating means the facility is built and in commercial service.
When did Pukchang power station start operating?
Start year: 1972. Current status: Operating. Its 16 operating units were commissioned between 1972 and 2018.
How much electricity does Pukchang power station generate?
Actual output data are not published for every plant. As an indicative estimate, Pukchang power station would produce about 7.0 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Pukchang power station compared with other facilities in North Korea?
Pukchang power station ranks #1 by capacity among 7 comparable coal facilities tracked in North Korea.