Overview
Global Energy Monitor tracks 6 units or phases at this site (under construction 300 MW, planned 1.50 GW).
Technology: unknown; fuel: coal: unknown.
Ownership: Xekong Thermal Power Plant Co Ltd (parent company: Phonesack Group Co Ltd).
6 further units or phases are scheduled to come online in 2028–2030.
Why it matters
- The 2nd-largest coal-fired power station in Laos by capacity (of 4 operating, under-construction and planned coal facilities tracked).
- If completed, it would add 1.80 GW to Laos's coal fleet — equivalent to 96% of today's operating coal capacity.
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in Laos
Laos has 1.88 GW of operating coal capacity across 1 plants in the Global Energy Monitor dataset — 14% of the country's total operating power capacity of 13.7 GW.
The coal pipeline in Laos includes 1.80 GW under construction and 1.60 GW at earlier planning stages.
Other major coal plants in Laos include Hongsa power station (1.88 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 300 MW | Construction | unknown | 2028 | 2058 |
| Unit 2 | 300 MW | Pre-construction | unknown | 2029 | 2059 |
| Unit 3 | 300 MW | Pre-construction | unknown | 2029 | 2059 |
| Unit 4 | 300 MW | Pre-construction | unknown | 2030 | 2060 |
| Unit 5 | 300 MW | Pre-construction | unknown | 2030 | 2060 |
| Unit 6 | 300 MW | Pre-construction | unknown | 2030 | 2060 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Location
Phonesack Xekong power station is located in Xékong, Laos, at approximately 15.7477, 106.7470. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Phonesack Xekong power station is owned by Xekong Thermal Power Plant Co Ltd. The ultimate parent company is Phonesack Group Co Ltd. Across the dataset, Phonesack Group Co Ltd is linked to 2 power plants with 650 MW of operating capacity.
Frequently asked questions
What is the capacity of Phonesack Xekong power station?
Phonesack Xekong power station has a capacity of 1.80 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.
What type of facility is Phonesack Xekong power station?
Phonesack Xekong power station is a coal-fired power station.
Who owns Phonesack Xekong power station?
Phonesack Xekong power station is owned by Xekong Thermal Power Plant Co Ltd. The ultimate parent company is Phonesack Group Co Ltd.
Where is Phonesack Xekong power station located?
It is located in Xékong, Laos. Approximate coordinates: 15.7477, 106.7470.
Is Phonesack Xekong power station operational?
According to the latest data, Phonesack Xekong power station is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Phonesack Xekong power station expected to start?
Start year: 2028. Current status: Construction. 6 further units or phases are scheduled to come online in 2028–2030.
How big is Phonesack Xekong power station compared with other facilities in Laos?
Phonesack Xekong power station ranks #2 by capacity among 4 comparable coal facilities tracked in Laos.