Overview
Global Energy Monitor tracks 2 units or phases at this site (under construction 1.50 GW).
Technology: combined cycle; fuel: natural gas.
Ownership: Persian Gulf Mineral and Metal Industries Special Economic Zone Co (parent company: Iranian Mines & Mining Industries Development & Renovation Organization).
1 further units or phases are scheduled to come online in 2026.
Why it matters
- The 10th-largest oil- and gas-fired power station in Iran by capacity (of 164 operating, under-construction and planned oil & gas facilities tracked).
- If completed, it would add 1.50 GW to Iran's oil & gas fleet — equivalent to 1.8% of today's operating oil & gas capacity.
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Iran
Iran has 81.4 GW of operating oil & gas capacity across 145 plants in the Global Energy Monitor dataset — 85% of the country's total operating power capacity of 95.9 GW.
The oil & gas pipeline in Iran includes 4.98 GW under construction and 3.32 GW at earlier planning stages.
Other major oil & gas plants in Iran include Damavand power station (2.87 GW), Shahid Salimi power station (2.56 GW) and Shahid Rajaee power station (2.04 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1- Hormozgan Steel Power Plant | 1.00 GW | Construction | combined cycle | 2026 | |
| 2-Kaveh Steel | 500 MW | Construction | combined cycle |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at PGSEZ power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
PGSEZ power station is located in Hormozgan, Iran, at approximately 27.0965, 56.0417. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
PGSEZ power station is owned by Persian Gulf Mineral and Metal Industries Special Economic Zone Co. The ultimate parent company is Iranian Mines & Mining Industries Development & Renovation Organization. Across the dataset, Iranian Mines & Mining Industries Development & Renovation Organization is linked to 12 power plants with 3.57 GW of operating capacity.
Frequently asked questions
What is the capacity of PGSEZ power station?
PGSEZ power station has a capacity of 1.50 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is PGSEZ power station?
PGSEZ power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns PGSEZ power station?
PGSEZ power station is owned by Persian Gulf Mineral and Metal Industries Special Economic Zone Co. The ultimate parent company is Iranian Mines & Mining Industries Development & Renovation Organization.
Where is PGSEZ power station located?
It is located in Hormozgan, Iran. Approximate coordinates: 27.0965, 56.0417.
Is PGSEZ power station operational?
According to the latest data, PGSEZ power station is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is PGSEZ power station expected to start?
Start year: 2026. Current status: Construction. 1 further units or phases are scheduled to come online in 2026.
How big is PGSEZ power station compared with other facilities in Iran?
PGSEZ power station ranks #10 by capacity among 164 comparable oil & gas facilities tracked in Iran.