Overview
Global Energy Monitor tracks 12 units or phases at this site (operating 1.96 GW).
Technology: unknown, subcritical; fuel: coal: unknown.
Ownership: Inner Mongolia Erdos Electric Power Co Ltd (parent company: Inner Mongolia Eerduosi Resources Co Ltd; Mitsui & Co Ltd; unknown).
Its 10 operating units were commissioned between 2005 and 2013.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 8.6 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in China
China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.
The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.
Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| New Unit 1 | 600 MW | Cancelled | unknown | ||
| New Unit 2 | 600 MW | Cancelled | unknown | ||
| Unit 1 | 330 MW | subcritical | 2005 | ||
| Unit 2 | 330 MW | subcritical | 2005 | ||
| Unit 3 | 330 MW | subcritical | 2010 | ||
| Unit 4 | 330 MW | subcritical | 2010 | ||
| Unit 5 | 50 MW | unknown | 2013 | ||
| Unit 6 | 50 MW | unknown | 2013 | ||
| Unit 7 | 135 MW | unknown | 2013 | ||
| Unit 8 | 135 MW | unknown | 2013 | ||
| Unit 9 | 135 MW | unknown | 2013 | ||
| Unit 10 | 135 MW | unknown | 2013 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Ordos Power Qipanjing power station
Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Ordos Power Qipanjing power station is located in Inner Mongolia, China, at approximately 39.3852, 106.9657. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Ordos Power Qipanjing power station is owned by Inner Mongolia Erdos Electric Power Co Ltd. The ultimate parent company is Inner Mongolia Eerduosi Resources Co Ltd; Mitsui & Co Ltd; unknown. Across the dataset, Inner Mongolia Eerduosi Resources Co Ltd is linked to 3 power plants with 2.68 GW of operating capacity.
Frequently asked questions
What is the capacity of Ordos Power Qipanjing power station?
Ordos Power Qipanjing power station has a capacity of 1.96 GW according to the latest Global Energy Monitor data. This figure covers the 12 units or phases listed for the site.
What type of facility is Ordos Power Qipanjing power station?
Ordos Power Qipanjing power station is a coal-fired power station. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Who owns Ordos Power Qipanjing power station?
Ordos Power Qipanjing power station is owned by Inner Mongolia Erdos Electric Power Co Ltd. The ultimate parent company is Inner Mongolia Eerduosi Resources Co Ltd; Mitsui & Co Ltd; unknown.
Where is Ordos Power Qipanjing power station located?
It is located in Inner Mongolia, China. Approximate coordinates: 39.3852, 106.9657.
Is Ordos Power Qipanjing power station operational?
According to the latest data, Ordos Power Qipanjing power station is in operation. Operating means the facility is built and in commercial service.
When did Ordos Power Qipanjing power station start operating?
Start year: 2005. Current status: Operating. Its 10 operating units were commissioned between 2005 and 2013.
How much electricity does Ordos Power Qipanjing power station generate?
Actual output data are not published for every plant. As an indicative estimate, Ordos Power Qipanjing power station would produce about 8.6 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Ordos Power Qipanjing power station compared with other facilities in China?
Ordos Power Qipanjing power station ranks #193 by capacity among 1188 comparable coal facilities tracked in China.
Nearby energy infrastructure
- Haibowan power station
- Shizuishan power station
- Inner Mongolia Alxa High-Tech Development Zone solar farm
- Wuhai hydroelectric plant
- Ningxia Shizuishan (Xinghai) solar farm
- Pingluo power station
- Inner Mongolia Alxa League Renewable Power to Wuhai solar farm
- Inner Mongolia Bayannaoer Solar/Storage/Ecological Management complex