Overview
Technology: conventional storage.
Ownership: OSHC "Barki Tojik".
Why it matters
- The largest hydropower plant in Tajikistan by capacity, out of 8 operating hydropower facilities tracked in the country.
- Provides about 46% of Tajikistan's operating hydropower capacity and roughly 42% of all operating power capacity in the country in the dataset.
- Ranks #44 worldwide among hydropower facilities of the same status group by capacity.
- At a typical capacity factor of 40% for this technology, it would generate roughly 9.5 TWh of electricity a year (indicative estimate).
Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.
Hydropower power in Tajikistan
Tajikistan has 5.83 GW of operating hydropower capacity across 8 plants in the Global Energy Monitor dataset — 91% of the country's total operating power capacity of 6.44 GW.
The hydropower pipeline in Tajikistan includes 295 MW under construction and 1.41 GW at earlier planning stages.
Other major hydropower plants in Tajikistan include Rogun hydroelectric plant (1.20 GW).
How hydropower plants work
Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.
Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.
Technology at Nurek hydroelectric plant
Its reservoir allows water to be stored and power to be dispatched when it is most needed.
Location
Nurek hydroelectric plant is located in Khatlon Region, Tajikistan, at approximately 38.3717, 69.3481. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Nurek hydroelectric plant is owned by OSHC "Barki Tojik". Across the dataset, OSHC "Barki Tojik" is linked to 11 power plants with 4.38 GW of operating capacity.
Frequently asked questions
What is the capacity of Nurek hydroelectric plant?
Nurek hydroelectric plant has a capacity of 2.70 GW according to the latest Global Energy Monitor data.
What type of facility is Nurek hydroelectric plant?
Nurek hydroelectric plant is a hydropower plant. Its reservoir allows water to be stored and power to be dispatched when it is most needed.
Who owns Nurek hydroelectric plant?
Nurek hydroelectric plant is owned by OSHC "Barki Tojik".
Where is Nurek hydroelectric plant located?
It is located in Khatlon Region, Tajikistan. Approximate coordinates: 38.3717, 69.3481.
Is Nurek hydroelectric plant operational?
According to the latest data, Nurek hydroelectric plant is in operation. Operating means the facility is built and in commercial service.
When did Nurek hydroelectric plant start operating?
Start year: 1972. Current status: Operating.
How much electricity does Nurek hydroelectric plant generate?
Actual output data are not published for every plant. As an indicative estimate, Nurek hydroelectric plant would produce about 9.5 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Nurek hydroelectric plant compared with other facilities in Tajikistan?
Nurek hydroelectric plant ranks #1 by capacity among 8 comparable hydropower facilities tracked in Tajikistan.