Overview
Global Energy Monitor tracks 2 units or phases at this site (operating 1.00 GW).
Technology: unknown; fuel: coal: lignite.
Ownership: NLC India Ltd.
Its 2 operating units were commissioned between 2019 and 2021.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 4.4 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in India
India has 253.8 GW of operating coal capacity across 285 plants in the Global Energy Monitor dataset — 52% of the country's total operating power capacity of 485.3 GW.
The coal pipeline in India includes 20.4 GW under construction and 35.6 GW at earlier planning stages.
Other major coal plants in India include Vindhyachal power station (4.76 GW), Mundra Thermal Power Project (Adani) (4.62 GW) and Ramagundam power station (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Unit 1 | 500 MW | unknown | 2019 | ||
| Unit 2 | 500 MW | unknown | 2021 |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Location
New Neyveli Thermal Power Station is located in Tamil Nadu, India, at approximately 11.5471, 79.4429. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
New Neyveli Thermal Power Station is owned by NLC India Ltd. Across the dataset, NLC India Ltd is linked to 23 power plants with 7.57 GW of operating capacity.
Frequently asked questions
What is the capacity of New Neyveli Thermal Power Station?
New Neyveli Thermal Power Station has a capacity of 1.00 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is New Neyveli Thermal Power Station?
New Neyveli Thermal Power Station is a coal-fired power station.
Who owns New Neyveli Thermal Power Station?
New Neyveli Thermal Power Station is owned by NLC India Ltd.
Where is New Neyveli Thermal Power Station located?
It is located in Tamil Nadu, India. Approximate coordinates: 11.5471, 79.4429.
Is New Neyveli Thermal Power Station operational?
According to the latest data, New Neyveli Thermal Power Station is in operation. Operating means the facility is built and in commercial service.
When did New Neyveli Thermal Power Station start operating?
Start year: 2019. Current status: Operating. Its 2 operating units were commissioned between 2019 and 2021.
How much electricity does New Neyveli Thermal Power Station generate?
Actual output data are not published for every plant. As an indicative estimate, New Neyveli Thermal Power Station would produce about 4.4 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is New Neyveli Thermal Power Station compared with other facilities in India?
New Neyveli Thermal Power Station ranks #108 by capacity among 285 comparable coal facilities tracked in India.