Overview
Technology: conventional storage.
Ownership: Iran Water and Power Resources Development Co.
Why it matters
- The 2nd-largest hydropower plant in Iran by capacity (of 26 operating hydropower facilities tracked).
- Provides about 8.2% of Iran's operating hydropower capacity and roughly 1% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 3.5 TWh of electricity a year (indicative estimate).
Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.
Hydropower power in Iran
Iran has 12.2 GW of operating hydropower capacity across 26 plants in the Global Energy Monitor dataset — 13% of the country's total operating power capacity of 95.9 GW.
The hydropower pipeline in Iran includes 910 MW under construction.
Other major hydropower plants in Iran include Karun III hydroelectric plant (2.00 GW), Karun IV hydroelectric plant (1.00 GW) and Masjed Soleyman 2 hydroelectric plant (1.00 GW).
How hydropower plants work
Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.
Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.
Technology at Masjed Soleyman 1 hydroelectric plant
Its reservoir allows water to be stored and power to be dispatched when it is most needed.
Location
Masjed Soleyman 1 hydroelectric plant is located in Khuzestan Province, Iran, at approximately 32.0274, 49.4012. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Masjed Soleyman 1 hydroelectric plant is owned by Iran Water and Power Resources Development Co. Across the dataset, Iran Water and Power Resources Development Co is linked to 18 power plants with 11.0 GW of operating capacity.
Frequently asked questions
What is the capacity of Masjed Soleyman 1 hydroelectric plant?
Masjed Soleyman 1 hydroelectric plant has a capacity of 1.00 GW according to the latest Global Energy Monitor data.
What type of facility is Masjed Soleyman 1 hydroelectric plant?
Masjed Soleyman 1 hydroelectric plant is a hydropower plant. Its reservoir allows water to be stored and power to be dispatched when it is most needed.
Who owns Masjed Soleyman 1 hydroelectric plant?
Masjed Soleyman 1 hydroelectric plant is owned by Iran Water and Power Resources Development Co.
Where is Masjed Soleyman 1 hydroelectric plant located?
It is located in Khuzestan Province, Iran. Approximate coordinates: 32.0274, 49.4012.
Is Masjed Soleyman 1 hydroelectric plant operational?
According to the latest data, Masjed Soleyman 1 hydroelectric plant is in operation. Operating means the facility is built and in commercial service.
When did Masjed Soleyman 1 hydroelectric plant start operating?
Start year: 2002. Current status: Operating.
How much electricity does Masjed Soleyman 1 hydroelectric plant generate?
Actual output data are not published for every plant. As an indicative estimate, Masjed Soleyman 1 hydroelectric plant would produce about 3.5 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is Masjed Soleyman 1 hydroelectric plant compared with other facilities in Iran?
Masjed Soleyman 1 hydroelectric plant ranks #2 by capacity among 26 comparable hydropower facilities tracked in Iran.