Solar · Philippines

Maragondon-Naic-Tanza 2 Solar Power Project

Maragondon-Naic-Tanza 2 Solar Power Project is a 160 MW solar power plant located in Cavite Province, Philippines. The facility is currently at the announced stage, with a targeted start date of 2027.

160 MWCapacity (all phases)
AnnouncedStatus
2027Start year
View on the interactive map →

Overview

Technology: PV.

Ownership: Solar Philippines Commercial Rooftop Projects Inc.

Why it matters

  • If completed, it would add 160 MW to Philippines's solar fleet — equivalent to 4.3% of today's operating solar capacity.
  • Utility-scale solar produces electricity during daylight hours; its value to the grid increasingly depends on storage and transmission connections.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Frequently asked questions

What is the capacity of Maragondon-Naic-Tanza 2 Solar Power Project?

Maragondon-Naic-Tanza 2 Solar Power Project has a capacity of 160 MW according to the latest Global Energy Monitor data.

Who owns Maragondon-Naic-Tanza 2 Solar Power Project?

Solar Philippines Commercial Rooftop Projects Inc.

Where is Maragondon-Naic-Tanza 2 Solar Power Project located?

It is located in Cavite Province, Philippines. Approximate coordinates: 14.3318, 120.7703.

When is Maragondon-Naic-Tanza 2 Solar Power Project expected to start?

Start year: 2027. Current status: Announced.

Nearby energy infrastructure

Other assets of the same owner

Special projects