Overview
Technology: boiling water reactor.
Ownership: Kernkraftwerk Leibstadt.
Why it matters
- The largest nuclear power plant in Switzerland by capacity, out of 3 operating nuclear facilities tracked in the country.
- Provides about 41% of Switzerland's operating nuclear capacity and roughly 7.1% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 85% for this technology, it would generate roughly 9.5 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in Switzerland
Switzerland has 3.10 GW of operating nuclear capacity across 3 plants in the Global Energy Monitor dataset — 17% of the country's total operating power capacity of 17.9 GW.
Other major nuclear plants in Switzerland include Goesgen nuclear power plant (1.06 GW).
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Leibstadt nuclear power plant
Boiling water reactors (BWR) boil water directly in the reactor core and send the steam straight to the turbine.
Location
Leibstadt nuclear power plant is located in Aargau, Switzerland, at approximately 47.6012, 8.1845. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Leibstadt nuclear power plant is owned by Kernkraftwerk Leibstadt.
Frequently asked questions
What is the capacity of Leibstadt nuclear power plant?
Leibstadt nuclear power plant has a capacity of 1.28 GW according to the latest Global Energy Monitor data.
What type of facility is Leibstadt nuclear power plant?
Leibstadt nuclear power plant is a nuclear power plant. Boiling water reactors (BWR) boil water directly in the reactor core and send the steam straight to the turbine.
Who owns Leibstadt nuclear power plant?
Leibstadt nuclear power plant is owned by Kernkraftwerk Leibstadt.
Where is Leibstadt nuclear power plant located?
It is located in Aargau, Switzerland. Approximate coordinates: 47.6012, 8.1845.
Is Leibstadt nuclear power plant operational?
According to the latest data, Leibstadt nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Leibstadt nuclear power plant start operating?
Start year: 1984. Current status: Operating.
How much electricity does Leibstadt nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Leibstadt nuclear power plant would produce about 9.5 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Leibstadt nuclear power plant compared with other facilities in Switzerland?
Leibstadt nuclear power plant ranks #1 by capacity among 3 comparable nuclear facilities tracked in Switzerland.