Overview
Global Energy Monitor tracks 3 units or phases at this site (operating 2.20 GW, retired 100 MW).
Technology: pressurized heavy water reactor, pressurized water reactor.
Ownership: Pakistan Atomic Energy Commission.
Its 2 operating units were commissioned between 2021 and 2022. 1 units have already been retired (2021).
Why it matters
- The largest nuclear power plant in Pakistan by capacity, out of 2 operating nuclear facilities tracked in the country.
- Provides about 62% of Pakistan's operating nuclear capacity and roughly 4.6% of all operating power capacity in the country in the dataset.
- Ranks #76 worldwide among nuclear facilities of the same status group by capacity.
- At a typical capacity factor of 85% for this technology, it would generate roughly 16 TWh of electricity a year (indicative estimate).
Nuclear plants supply large volumes of low-carbon baseload electricity with very high capacity factors, so a single station can cover a significant share of national demand.
Nuclear power in Pakistan
Pakistan has 3.53 GW of operating nuclear capacity across 2 plants in the Global Energy Monitor dataset — 7.4% of the country's total operating power capacity of 47.8 GW.
Other major nuclear plants in Pakistan include Chashma nuclear power plant (1.33 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 100 MW | Retired | pressurized heavy water reactor | 1972 | 2021 |
| 2 | 1.10 GW | pressurized water reactor | 2021 | ||
| 3 | 1.10 GW | pressurized water reactor | 2022 |
How nuclear power plants work
A nuclear power plant uses heat from controlled fission of uranium (or plutonium) fuel in a reactor core to produce steam, which drives a turbine-generator in the same way as a thermal power station. The reactor is surrounded by multiple safety barriers and a containment building.
Nuclear units typically run more than 90% of the hours in a year, so a single large reactor can supply several terawatt-hours of almost carbon-free electricity annually. Construction times are long and capital costs high, but fuel costs are low and plants are often licensed to operate for 60 years or more.
Technology at Karachi nuclear power plant
Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit. Pressurised heavy water reactors (PHWR), such as the CANDU design, use heavy water as moderator and coolant and can run on natural uranium.
Location
Karachi nuclear power plant is located in Sindh, Pakistan, at approximately 24.8450, 66.7888. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Karachi nuclear power plant is owned by Pakistan Atomic Energy Commission. Across the dataset, Pakistan Atomic Energy Commission is linked to 2 power plants with 3.53 GW of operating capacity.
Frequently asked questions
What is the capacity of Karachi nuclear power plant?
Karachi nuclear power plant has a capacity of 2.20 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.
What type of facility is Karachi nuclear power plant?
Karachi nuclear power plant is a nuclear power plant. Pressurised water reactors (PWR), the most common reactor type worldwide, keep the primary coolant under high pressure and transfer its heat to a separate steam circuit.
Who owns Karachi nuclear power plant?
Karachi nuclear power plant is owned by Pakistan Atomic Energy Commission.
Where is Karachi nuclear power plant located?
It is located in Sindh, Pakistan. Approximate coordinates: 24.8450, 66.7888.
Is Karachi nuclear power plant operational?
According to the latest data, Karachi nuclear power plant is in operation. Operating means the facility is built and in commercial service.
When did Karachi nuclear power plant start operating?
Start year: 2021. Current status: Operating. Its 2 operating units were commissioned between 2021 and 2022. 1 units have already been retired (2021).
How much electricity does Karachi nuclear power plant generate?
Actual output data are not published for every plant. As an indicative estimate, Karachi nuclear power plant would produce about 16 TWh a year, assuming a capacity factor of 85%, which is typical for this technology.
How big is Karachi nuclear power plant compared with other facilities in Pakistan?
Karachi nuclear power plant ranks #1 by capacity among 2 comparable nuclear facilities tracked in Pakistan.