Jinping Stage 2 hydroelectric plant is a 4.80 GW hydropower plant located in Sichuan, China. The facility is currently in operation, with its first unit entering service in 2014.

4.80 GWCapacity
OperatingStatus
2014Start year
View on the interactive map →

Overview

Technology: conventional and run-of-river.

Ownership: State Development Investment Corporation Power Shareholding Co Ltd; Sichuan Chuantou Energy Shareholding Co Ltd.

Why it matters

  • The 8th-largest hydropower plant in China by capacity (of 1006 operating hydropower facilities tracked).
  • Provides about 1.3% of China's operating hydropower capacity.
  • Ranks #17 worldwide among hydropower facilities of the same status group by capacity.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 17 TWh of electricity a year (indicative estimate).

Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.

Hydropower power in China

China has 372.5 GW of operating hydropower capacity across 1,006 plants in the Global Energy Monitor dataset — 12% of the country's total operating power capacity of 3,086.2 GW.

The hydropower pipeline in China includes 241.1 GW under construction and 321.5 GW at earlier planning stages.

Other major hydropower plants in China include Motuo hydroelectric plant (60.0 GW), Three Gorges Dam hydroelectric plant (22.5 GW) and Baihetan hydroelectric plant (16.0 GW).

See the full list: Hydropower plants in China →

How hydropower plants work

Hydropower plants convert the energy of falling or flowing water into electricity: water passes through turbines placed at the foot of a dam or along a diversion channel, and the turbines drive generators. Output depends on the height of the water drop (the head) and the volume of water flowing.

Reservoir and pumped-storage schemes can store energy and release it within minutes, which makes hydropower one of the most flexible sources on the grid. Annual generation varies with rainfall and snowmelt, and large dams can have significant effects on river ecosystems and downstream water use.

Technology at Jinping Stage 2 hydroelectric plant

Run-of-river plants use the natural flow of a river with little or no storage, so output follows seasonal water levels.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Jinping Stage 2 hydroelectric plant is located in Sichuan, China, at approximately 28.1318, 101.7912. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Jinping Stage 2 hydroelectric plant is owned by State Development Investment Corporation Power Shareholding Co Ltd; Sichuan Chuantou Energy Shareholding Co Ltd. Across the dataset, State Development Investment Corporation Power Shareholding Co Ltd is linked to 12 power plants with 19.2 GW of operating capacity.

Frequently asked questions

What is the capacity of Jinping Stage 2 hydroelectric plant?

Jinping Stage 2 hydroelectric plant has a capacity of 4.80 GW according to the latest Global Energy Monitor data.

What type of facility is Jinping Stage 2 hydroelectric plant?

Jinping Stage 2 hydroelectric plant is a hydropower plant. Run-of-river plants use the natural flow of a river with little or no storage, so output follows seasonal water levels.

Who owns Jinping Stage 2 hydroelectric plant?

Jinping Stage 2 hydroelectric plant is owned by State Development Investment Corporation Power Shareholding Co Ltd; Sichuan Chuantou Energy Shareholding Co Ltd.

Where is Jinping Stage 2 hydroelectric plant located?

It is located in Sichuan, China. Approximate coordinates: 28.1318, 101.7912.

Is Jinping Stage 2 hydroelectric plant operational?

According to the latest data, Jinping Stage 2 hydroelectric plant is in operation. Operating means the facility is built and in commercial service.

When did Jinping Stage 2 hydroelectric plant start operating?

Start year: 2014. Current status: Operating.

How much electricity does Jinping Stage 2 hydroelectric plant generate?

Actual output data are not published for every plant. As an indicative estimate, Jinping Stage 2 hydroelectric plant would produce about 17 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Jinping Stage 2 hydroelectric plant compared with other facilities in China?

Jinping Stage 2 hydroelectric plant ranks #8 by capacity among 1006 comparable hydropower facilities tracked in China.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.