Wind · China

Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms

Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms is a 2.50 GW wind farm located in Inner Mongolia, China. The facility is currently in operation, with its first unit entering service in 2025.

2.50 GWCapacity
OperatingStatus
2025Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 3 units or phases at this site (operating 2.50 GW).

Technology: Onshore.

Ownership: Inner Mongolia Erenhot Mengneng Yida New Energy Co Ltd.

Why it matters

  • The 4th-largest wind farm in China by capacity (of 4869 operating wind facilities tracked).
  • Ranks #5 worldwide among wind facilities of the same status group by capacity.
  • At a typical capacity factor of 30% for this technology, it would generate roughly 6.6 TWh of electricity a year (indicative estimate).

Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.

Wind power in China

China has 542.8 GW of operating wind capacity across 4,869 plants in the Global Energy Monitor dataset — 18% of the country's total operating power capacity of 3,086.2 GW.

The wind pipeline in China includes 214.3 GW under construction and 467.6 GW at earlier planning stages.

Other major wind plants in China include Qinghai Hainan Clean Energy Transmission Base wind farm (6.00 GW), Gansu - Shandong Power Export Huanxian (Huaneng) Wind/Solar Demonstration Project wind farm (4.50 GW) and Xinjiang - Chongqing Power Export wind farms (4.20 GW).

See the full list: Wind farms in China →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Erenhot 1.00 GW Operating Onshore 2025
Erenhot Port 500 MW Operating Onshore 2025
Sonid Right Banner 1.00 GW Operating Onshore 2025

How wind farms work

A wind farm is a group of wind turbines whose rotors turn a generator, either directly or through a gearbox. Modern onshore turbines are typically rated at 3–7 MW each and offshore turbines at 8–15 MW; power is collected through an internal cable network and fed into the grid at a substation.

Output rises steeply with wind speed, so location matters more than for almost any other technology. Onshore wind farms usually reach capacity factors of 25–40% and offshore farms 40–50%. Because generation is variable, wind relies on strong transmission links, storage and flexible plants to balance supply and demand.

Technology at Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms

This is an onshore wind farm, built on land.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms is located in Inner Mongolia, China, at approximately 43.4901, 112.2310. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms is owned by Inner Mongolia Erenhot Mengneng Yida New Energy Co Ltd.

Frequently asked questions

What is the capacity of Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms?

Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms has a capacity of 2.50 GW according to the latest Global Energy Monitor data. This figure covers the 3 units or phases listed for the site.

What type of facility is Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms?

Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms is a wind farm. This is an onshore wind farm, built on land.

Who owns Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms?

Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms is owned by Inner Mongolia Erenhot Mengneng Yida New Energy Co Ltd.

Where is Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms located?

It is located in Inner Mongolia, China. Approximate coordinates: 43.4901, 112.2310.

Is Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms operational?

According to the latest data, Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms is in operation. Operating means the facility is built and in commercial service.

When did Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms start operating?

Start year: 2025. Current status: Operating.

How much electricity does Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms generate?

Actual output data are not published for every plant. As an indicative estimate, Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms would produce about 6.6 TWh a year, assuming a capacity factor of 30%, which is typical for this technology.

How big is Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms compared with other facilities in China?

Inner Mongolia Xilingol 2500 MW Guaranteed Offtake wind farms ranks #4 by capacity among 4869 comparable wind facilities tracked in China.

Nearby energy infrastructure

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects