Wind · China

Inner Mongolia Urad Middle Banner (Mengneng) wind farm with storage

Inner Mongolia Urad Middle Banner (Mengneng) wind farm with storage is a 1.50 GW wind farm located in Inner Mongolia, China. The facility is currently in operation, with its first unit entering service in 2025.

1.50 GWCapacity
OperatingStatus
2025Start year
View on the interactive map →

Overview

GEM tracks 3 units or phases at this site (operating 1.50 GW).

Technology: Onshore.

Ownership: Inner Mongolia Huifeng Energy Co Ltd.

Why it matters

  • The 15th-largest wind farm in China by capacity (of 4869 operating wind facilities tracked).
  • Ranks #17 worldwide among wind facilities of the same status group by capacity.
  • Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
Ganlin Number 2 400 MW Operating Onshore 2025
Ganlin Number 3 700 MW Operating Onshore 2025
Other 400 MW Operating Onshore 2025

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Frequently asked questions

What is the capacity of Inner Mongolia Urad Middle Banner (Mengneng) wind farm with storage?

Inner Mongolia Urad Middle Banner (Mengneng) wind farm with storage has a capacity of 1.50 GW according to the latest Global Energy Monitor data.

Who owns Inner Mongolia Urad Middle Banner (Mengneng) wind farm with storage?

Inner Mongolia Huifeng Energy Co Ltd.

Where is Inner Mongolia Urad Middle Banner (Mengneng) wind farm with storage located?

It is located in Inner Mongolia, China. Approximate coordinates: 42.3820, 107.5440.

When did Inner Mongolia Urad Middle Banner (Mengneng) wind farm with storage start operating?

Start year: 2025. Current status: Operating.

Nearby energy infrastructure

Other assets of the same owner

Special projects