Overview
Global Energy Monitor tracks 2 units or phases at this site (operating 3.00 GW).
Technology: Onshore.
Ownership: China Guangdong Nuclear (Xing'an Leauge) New Energy LTD Keyouzhong Banner Branch Co.
Its 2 operating units were commissioned between 2022 and 2023.
Why it matters
- The 3rd-largest wind farm in China by capacity (of 4869 operating wind facilities tracked).
- Ranks #3 worldwide among wind facilities of the same status group by capacity.
- At a typical capacity factor of 30% for this technology, it would generate roughly 7.9 TWh of electricity a year (indicative estimate).
Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.
Wind power in China
China has 542.8 GW of operating wind capacity across 4,869 plants in the Global Energy Monitor dataset — 18% of the country's total operating power capacity of 3,086.2 GW.
The wind pipeline in China includes 214.3 GW under construction and 467.6 GW at earlier planning stages.
Other major wind plants in China include Qinghai Hainan Clean Energy Transmission Base wind farm (6.00 GW), Gansu - Shandong Power Export Huanxian (Huaneng) Wind/Solar Demonstration Project wind farm (4.50 GW) and Xinjiang - Chongqing Power Export wind farms (4.20 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 Horqin Right Front Banner | 1.00 GW | Onshore | 2022 | ||
| 2 Horqin Right Middle Banner | 2.00 GW | Onshore | 2023 |
How wind farms work
A wind farm is a group of wind turbines whose rotors turn a generator, either directly or through a gearbox. Modern onshore turbines are typically rated at 3–7 MW each and offshore turbines at 8–15 MW; power is collected through an internal cable network and fed into the grid at a substation.
Output rises steeply with wind speed, so location matters more than for almost any other technology. Onshore wind farms usually reach capacity factors of 25–40% and offshore farms 40–50%. Because generation is variable, wind relies on strong transmission links, storage and flexible plants to balance supply and demand.
Technology at Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base
This is an onshore wind farm, built on land.
Location
Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base is located in Inner Mongolia, China, at approximately 44.7673, 121.7847. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base is owned by China Guangdong Nuclear (Xing'an Leauge) New Energy LTD Keyouzhong Banner Branch Co.
Frequently asked questions
What is the capacity of Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base?
Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base has a capacity of 3.00 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.
What type of facility is Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base?
Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base is a wind farm. This is an onshore wind farm, built on land.
Who owns Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base?
Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base is owned by China Guangdong Nuclear (Xing'an Leauge) New Energy LTD Keyouzhong Banner Branch Co.
Where is Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base located?
It is located in Inner Mongolia, China. Approximate coordinates: 44.7673, 121.7847.
Is Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base operational?
According to the latest data, Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base is in operation. Operating means the facility is built and in commercial service.
When did Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base start operating?
Start year: 2022. Current status: Operating. Its 2 operating units were commissioned between 2022 and 2023.
How much electricity does Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base generate?
Actual output data are not published for every plant. As an indicative estimate, Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base would produce about 7.9 TWh a year, assuming a capacity factor of 30%, which is typical for this technology.
How big is Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base compared with other facilities in China?
Inner Mongolia Hinggan League (China Guangdong Nuclear) wind power base ranks #3 by capacity among 4869 comparable wind facilities tracked in China.
Nearby energy infrastructure
- Keyouzhong power station
- Inner Mongolia Power Export Tongliao (State Power Investment) wind farms
- Jilin Province Baicheng Front Runner solar farm
- Inner Mongolia Horqin Right Middle Banner (Inner Mongolia Energy) wind farm
- Inner Mongolia Tuquan (Inner Mongolia Energy) wind power base with storage
- Inner Mongolia Horqin Left Middle Banner Green Hydrogen and Ammonia wind farm
- Inner Mongolia Horqin Ecological Management Power Export wind farm
- CPI Baicheng power station