Overview
Technology: Onshore.
Ownership: Inner Mongolia Energy Group Jingpeng New Energy Co Ltd.
Why it matters
Wind output varies with weather, so large wind farms depend on transmission capacity and system flexibility to deliver their power to demand centres.
Wind power in China
China has 542.8 GW of operating wind capacity across 4,869 plants in the Global Energy Monitor dataset — 18% of the country's total operating power capacity of 3,086.2 GW.
The wind pipeline in China includes 214.3 GW under construction and 467.6 GW at earlier planning stages.
Other major wind plants in China include Qinghai Hainan Clean Energy Transmission Base wind farm (6.00 GW), Gansu - Shandong Power Export Huanxian (Huaneng) Wind/Solar Demonstration Project wind farm (4.50 GW) and Xinjiang - Chongqing Power Export wind farms (4.20 GW).
How wind farms work
A wind farm is a group of wind turbines whose rotors turn a generator, either directly or through a gearbox. Modern onshore turbines are typically rated at 3–7 MW each and offshore turbines at 8–15 MW; power is collected through an internal cable network and fed into the grid at a substation.
Output rises steeply with wind speed, so location matters more than for almost any other technology. Onshore wind farms usually reach capacity factors of 25–40% and offshore farms 40–50%. Because generation is variable, wind relies on strong transmission links, storage and flexible plants to balance supply and demand.
Technology at Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage
This is an onshore wind farm, built on land.
Location
Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage is located in Inner Mongolia, China, at approximately 43.1950, 118.2330. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage is owned by Inner Mongolia Energy Group Jingpeng New Energy Co Ltd.
Frequently asked questions
What is the capacity of Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage?
Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage has a capacity of 1.00 GW according to the latest Global Energy Monitor data.
What type of facility is Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage?
Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage is a wind farm. This is an onshore wind farm, built on land.
Who owns Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage?
Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage is owned by Inner Mongolia Energy Group Jingpeng New Energy Co Ltd.
Where is Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage located?
It is located in Inner Mongolia, China. Approximate coordinates: 43.1950, 118.2330.
Is Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage operational?
According to the latest data, Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage expected to start?
Start year: 2026. Current status: Construction.
How big is Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage compared with other facilities in China?
Inner Mongolia Hexigten Banner (Mengneng) wind farm with storage ranks #99 by capacity among 8309 comparable wind facilities tracked in China.