Overview
GEM tracks 3 units or phases at this site (operating 300 MW).
Technology: PV.
Ownership: CHN ENERGY Changyuan Electric Power Co Ltd; China Electric Power Engineering Consulting Group Zhongnan Electric Power Design Institute Co Ltd.
Why it matters
- Utility-scale solar produces electricity during daylight hours; its value to the grid increasingly depends on storage and transmission connections.
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 Jiangdong 100MW | 100 MW | PV | 2023 | ||
| 1 Jiangdong 200MW | 200 MW | PV | 2023 | ||
| 2 | 300 MW | Cancelled | PV |
Location
Frequently asked questions
What is the capacity of Hubei Zhongxiang Jiangdong (Guoneng) solar project?
Hubei Zhongxiang Jiangdong (Guoneng) solar project has a capacity of 300 MW according to the latest Global Energy Monitor data.
Who owns Hubei Zhongxiang Jiangdong (Guoneng) solar project?
CHN ENERGY Changyuan Electric Power Co Ltd; China Electric Power Engineering Consulting Group Zhongnan Electric Power Design Institute Co Ltd.
Where is Hubei Zhongxiang Jiangdong (Guoneng) solar project located?
It is located in Hubei, China. Approximate coordinates: 31.1691, 112.5873.
When did Hubei Zhongxiang Jiangdong (Guoneng) solar project start operating?
Start year: 2023. Current status: Operating.