Overview
Global Energy Monitor tracks 8 units or phases at this site (operating 2.53 GW, planned 2.00 GW).
Technology: subcritical, ultra-supercritical; fuel: coal: anthracite.
Ownership: Huaneng Hunan Yueyang Power Generation Co Ltd (parent company: Huaneng Power International Inc; Meiya Xiangtou Power Co Ltd; Hunan Xiangtou Holding Group Co Ltd; Hunan Xingxiang Investment Holding Group Co Ltd; Hunan…).
Its 6 operating units were commissioned between 1992 and 2012.
Why it matters
- At a typical capacity factor of 50% for this technology, it would generate roughly 11 TWh of electricity a year (indicative estimate).
Coal-fired units are typically run as baseload or mid-merit plants and are the most carbon-intensive form of power generation, which makes their retirement schedules a key indicator of national transition plans.
Coal power in China
China has 1,259.6 GW of operating coal capacity across 1,188 plants in the Global Energy Monitor dataset — 41% of the country's total operating power capacity of 3,086.2 GW.
The coal pipeline in China includes 93.1 GW under construction and 145.8 GW at earlier planning stages.
Other major coal plants in China include Beilun power station (7.10 GW), Pingwei power station (6.54 GW) and Togtoh power station (6.12 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| Phase I Unit 1 | 363 MW | subcritical | 1992 | ||
| Phase I Unit 2 | 363 MW | subcritical | 1992 | ||
| Phase II Unit 3 | 300 MW | subcritical | 2006 | ||
| Phase II Unit 4 | 300 MW | subcritical | 2006 | ||
| Phase III Unit 5 | 600 MW | ultra-supercritical | 2011 | ||
| Phase III Unit 6 | 600 MW | ultra-supercritical | 2012 | ||
| Phase IV Unit 7 | 1.00 GW | Announced | ultra-supercritical | ||
| Phase IV Unit 8 | 1.00 GW | Announced | ultra-supercritical |
How coal power plants work
A coal-fired power station burns pulverised coal in a boiler to turn water into high-pressure steam, which spins a turbine connected to a generator. After passing through the turbine the steam is condensed back into water — usually with river, sea or cooling-tower water — and pumped back to the boiler.
Efficiency depends mainly on steam temperature and pressure: older subcritical units convert roughly a third of the coal's energy into electricity, while modern supercritical and ultra-supercritical units reach 40–47%. Each megawatt-hour from coal emits roughly 0.8–1.1 tonnes of CO₂, the highest of any major power source, which is why many countries have set coal phase-out dates.
Technology at Huaneng Yueyang power station
Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%. Subcritical units are the oldest and least efficient coal-plant design, typically converting about 33–37% of the fuel's energy into electricity.
Location
Huaneng Yueyang power station is located in Hunan, China, at approximately 29.4498, 113.1623. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Huaneng Yueyang power station is owned by Huaneng Hunan Yueyang Power Generation Co Ltd. The ultimate parent company is Huaneng Power International Inc; Meiya Xiangtou Power Co Ltd; Hunan Xiangtou Holding Group Co Ltd; Hunan Xingxiang Investment Holding Group Co Ltd; Hunan Caixin Financial Holding Group Co Ltd. Across the dataset, Huaneng Power International Inc is linked to 164 power plants in 3 countries, with 115.4 GW of operating capacity.
Frequently asked questions
What is the capacity of Huaneng Yueyang power station?
Huaneng Yueyang power station has a capacity of 2.53 GW according to the latest Global Energy Monitor data. This figure covers the 8 units or phases listed for the site.
What type of facility is Huaneng Yueyang power station?
Huaneng Yueyang power station is a coal-fired power station. Ultra-supercritical units operate at the highest steam temperatures and pressures used in coal plants, reaching efficiencies of around 43–47%.
Who owns Huaneng Yueyang power station?
Huaneng Yueyang power station is owned by Huaneng Hunan Yueyang Power Generation Co Ltd. The ultimate parent company is Huaneng Power International Inc; Meiya Xiangtou Power Co Ltd; Hunan Xiangtou Holding Group Co Ltd; Hunan Xingxiang Investment Holding Group Co Ltd; Hunan Caixin Financial Holding Group Co Ltd.
Where is Huaneng Yueyang power station located?
It is located in Hunan, China. Approximate coordinates: 29.4498, 113.1623.
Is Huaneng Yueyang power station operational?
According to the latest data, Huaneng Yueyang power station is in operation. Operating means the facility is built and in commercial service.
When did Huaneng Yueyang power station start operating?
Start year: 1992. Current status: Operating. Its 6 operating units were commissioned between 1992 and 2012.
How much electricity does Huaneng Yueyang power station generate?
Actual output data are not published for every plant. As an indicative estimate, Huaneng Yueyang power station would produce about 11 TWh a year, assuming a capacity factor of 50%, which is typical for this technology.
How big is Huaneng Yueyang power station compared with other facilities in China?
Huaneng Yueyang power station ranks #110 by capacity among 1188 comparable coal facilities tracked in China.