Hydropower · South Sudan

Grand Fula hydroelectric plant

Grand Fula hydroelectric plant is a 1.08 GW hydropower plant located in Eastern Equatoria, South Sudan. The facility is currently at the pre-construction stage, with a targeted start date of 2035.

1.08 GWCapacity (all phases)
Pre-constructionStatus
2035Start year
View on the interactive map →

Overview

Technology: run-of-river.

Why it matters

  • Hydropower provides renewable electricity and, where reservoirs exist, dispatchable output and storage that help stabilise the grid; output varies with rainfall and river flows.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Frequently asked questions

What is the capacity of Grand Fula hydroelectric plant?

Grand Fula hydroelectric plant has a capacity of 1.08 GW according to the latest Global Energy Monitor data.

Where is Grand Fula hydroelectric plant located?

It is located in Eastern Equatoria, South Sudan. Approximate coordinates: 3.6729, 31.9719.

When is Grand Fula hydroelectric plant expected to start?

Start year: 2035. Current status: Pre-construction.

Nearby energy infrastructure

Special projects