Solar · Ghana

Ghana Meinergy solar project

Ghana Meinergy solar project is a 1.00 GW solar power plant located in Bono East Region, Ghana. The facility is currently under construction.

1.00 GWCapacity (all phases)
ConstructionStatus
View on the interactive map →

Overview

Global Energy Monitor tracks 12 units or phases at this site (under construction 200 MW, planned 800 MW).

Technology: PV.

Ownership: Meinergy Ghana.

Why it matters

  • The largest solar power plant in Ghana by capacity, out of 24 operating, under-construction and planned solar facilities tracked in the country.
  • If completed, it would add 1.00 GW to Ghana's solar fleet — equivalent to 262% of today's operating solar capacity.

Utility-scale solar produces electricity during daylight hours; its value to the grid increasingly depends on storage and transmission connections.

Solar power in Ghana

Ghana has 381 MW of operating solar capacity across 18 plants in the Global Energy Monitor dataset — 6.4% of the country's total operating power capacity of 5.94 GW.

The solar pipeline in Ghana includes 2.00 GW under construction and 1.51 GW at earlier planning stages.

Other major solar plants in Ghana include Norbert Anku solar park (1.00 GW).

See the full list: Solar farms in Ghana →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 100 MW Construction PV
2 100 MW Construction PV
3 80 MW Announced PV
4 80 MW Announced PV
5 80 MW Announced PV
6 80 MW Announced PV
7 80 MW Announced PV
8 80 MW Announced PV
9 80 MW Announced PV
10 80 MW Announced PV
11 80 MW Announced PV
12 80 MW Announced PV

How solar farms work

Most utility-scale solar plants use photovoltaic (PV) panels that convert sunlight directly into direct current, which inverters turn into alternating current for the grid. A smaller number of concentrated solar power (CSP) plants use mirrors to focus sunlight and heat a fluid that drives a steam turbine.

Solar output follows the daily and seasonal path of the sun, giving typical capacity factors of 15–30% depending on latitude and whether panels track the sun. Its costs have fallen by around 90% over the past decade, making it the fastest-growing power source worldwide; pairing plants with batteries shifts part of their output into the evening peak.

Technology at Ghana Meinergy solar project

The plant uses photovoltaic (PV) panels, which convert sunlight directly into electricity.

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Ghana Meinergy solar project is located in Bono East Region, Ghana, at approximately 8.1198, -1.0223. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Ghana Meinergy solar project is owned by Meinergy Ghana. Across the dataset, Meinergy Ghana is linked to 2 power plants with 20 MW of operating capacity.

Frequently asked questions

What is the capacity of Ghana Meinergy solar project?

Ghana Meinergy solar project has a capacity of 1.00 GW according to the latest Global Energy Monitor data. This figure covers the 12 units or phases listed for the site.

What type of facility is Ghana Meinergy solar project?

Ghana Meinergy solar project is a solar power plant. The plant uses photovoltaic (PV) panels, which convert sunlight directly into electricity.

Who owns Ghana Meinergy solar project?

Ghana Meinergy solar project is owned by Meinergy Ghana.

Where is Ghana Meinergy solar project located?

It is located in Bono East Region, Ghana. Approximate coordinates: 8.1198, -1.0223.

Is Ghana Meinergy solar project operational?

According to the latest data, Ghana Meinergy solar project is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

How big is Ghana Meinergy solar project compared with other facilities in Ghana?

Ghana Meinergy solar project ranks #1 by capacity among 24 comparable solar facilities tracked in Ghana.

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects