Oil & gas · Spain

Castellón power station

Castellón power station is a 1.64 GW oil- and gas-fired power station located in Valenciana, Spain. The facility is currently in operation, with its first unit entering service in 2002.

1.64 GWCapacity
OperatingStatus
2002Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 2 units or phases at this site (operating 1.64 GW).

Technology: combined cycle; fuel: natural gas.

Ownership: Iberdrola Generacion SA (parent company: Iberdrola SA).

Its 2 operating units were commissioned between 2002 and 2008.

Why it matters

  • The largest oil- and gas-fired power station in Spain by capacity, out of 85 operating oil & gas facilities tracked in the country.
  • Provides about 5.3% of Spain's operating oil & gas capacity and roughly 1.3% of all operating power capacity in the country in the dataset.
  • At a typical capacity factor of 40% for this technology, it would generate roughly 5.7 TWh of electricity a year (indicative estimate).

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Spain

Spain has 30.7 GW of operating oil & gas capacity across 85 plants in the Global Energy Monitor dataset — 25% of the country's total operating power capacity of 123.4 GW.

Other major oil & gas plants in Spain include Arcos de la Frontera power station (1.59 GW), Cartagena (Escombreras) power station (1.25 GW) and Sagunto power station (1.23 GW).

See the full list: Gas & oil power plants in Spain →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
3 782 MW Operating combined cycle 2002
4 858 MW Operating combined cycle 2008

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Castellón power station

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Castellón power station is located in Valenciana, Spain, at approximately 39.9592, -0.0010. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Castellón power station is owned by Iberdrola Generacion SA. The ultimate parent company is Iberdrola SA. Across the dataset, Iberdrola SA is linked to 156 power plants in 16 countries, with 21.8 GW of operating capacity.

Frequently asked questions

What is the capacity of Castellón power station?

Castellón power station has a capacity of 1.64 GW according to the latest Global Energy Monitor data. This figure covers the 2 units or phases listed for the site.

What type of facility is Castellón power station?

Castellón power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Castellón power station?

Castellón power station is owned by Iberdrola Generacion SA. The ultimate parent company is Iberdrola SA.

Where is Castellón power station located?

It is located in Valenciana, Spain. Approximate coordinates: 39.9592, -0.0010.

Is Castellón power station operational?

According to the latest data, Castellón power station is in operation. Operating means the facility is built and in commercial service.

When did Castellón power station start operating?

Start year: 2002. Current status: Operating. Its 2 operating units were commissioned between 2002 and 2008.

How much electricity does Castellón power station generate?

Actual output data are not published for every plant. As an indicative estimate, Castellón power station would produce about 5.7 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.

How big is Castellón power station compared with other facilities in Spain?

Castellón power station ranks #1 by capacity among 85 comparable oil & gas facilities tracked in Spain.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects