Overview
Global Energy Monitor tracks 4 units or phases at this site (under construction 1.50 GW).
Technology: combined cycle; fuel: LNG.
Ownership: B.Grimm Power PCL; Gulf Development PCL (parent company: B.Grimm Power PCL; small shareholder(s); natural person(s); UBS Group AG; Gulf Capital Holdings Ltd; Singapore Telecommunications Ltd).
1 further units or phases are scheduled to come online in 2026.
Why it matters
- The 12th-largest oil- and gas-fired power station in Vietnam by capacity (of 31 operating, under-construction and planned oil & gas facilities tracked).
- If completed, it would add 1.50 GW to Vietnam's oil & gas fleet — equivalent to 12% of today's operating oil & gas capacity.
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Vietnam
Vietnam has 12.7 GW of operating oil & gas capacity across 12 plants in the Global Energy Monitor dataset — 16% of the country's total operating power capacity of 80.0 GW.
The oil & gas pipeline in Vietnam includes 13.7 GW under construction and 30.4 GW at earlier planning stages.
Other major oil & gas plants in Vietnam include Haiphong LNG power station (4.80 GW), Quang Trach Power Center (4.40 GW) and Nhon Trach power station (2.84 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 1.50 GW | Construction | combined cycle | 2026 | |
| 2 | 1.50 GW | Cancelled | combined cycle | ||
| 3 | 1.50 GW | Cancelled | combined cycle | ||
| 4 | 1.50 GW | Cancelled | combined cycle |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at Ca Na power station
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Location
Ca Na power station is located in Ninh Thuận, Vietnam, at approximately 11.3356, 108.8891. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
Ca Na power station is owned by B.Grimm Power PCL; Gulf Development PCL. The ultimate parent company is B.Grimm Power PCL; small shareholder(s); natural person(s); UBS Group AG; Gulf Capital Holdings Ltd; Singapore Telecommunications Ltd. Across the dataset, B.Grimm Power PCL is linked to 22 power plants in 4 countries, with 4.38 GW of operating capacity.
Frequently asked questions
What is the capacity of Ca Na power station?
Ca Na power station has a capacity of 1.50 GW according to the latest Global Energy Monitor data. This figure covers the 4 units or phases listed for the site.
What type of facility is Ca Na power station?
Ca Na power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns Ca Na power station?
Ca Na power station is owned by B.Grimm Power PCL; Gulf Development PCL. The ultimate parent company is B.Grimm Power PCL; small shareholder(s); natural person(s); UBS Group AG; Gulf Capital Holdings Ltd; Singapore Telecommunications Ltd.
Where is Ca Na power station located?
It is located in Ninh Thuận, Vietnam. Approximate coordinates: 11.3356, 108.8891.
Is Ca Na power station operational?
According to the latest data, Ca Na power station is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.
When is Ca Na power station expected to start?
Start year: 2026. Current status: Construction. 1 further units or phases are scheduled to come online in 2026.
How big is Ca Na power station compared with other facilities in Vietnam?
Ca Na power station ranks #12 by capacity among 31 comparable oil & gas facilities tracked in Vietnam.