Solar · Philippines

Binalonan (Citicore) Solar Power Project

Binalonan (Citicore) Solar Power Project is a 113 MW solar power plant located in Luzon Island, Philippines. The facility is currently under construction, with a targeted start date of 2026.

113 MWCapacity (all phases)
ConstructionStatus
2026Start year
View on the interactive map →

Overview

GEM tracks 2 units or phases at this site (under construction 80 MW, planned 33 MW).

Technology: PV.

Ownership: Citicore Solar Pangasinan 2 Inc.

Why it matters

  • If completed, it would add 113 MW to Philippines's solar fleet — equivalent to 3.1% of today's operating solar capacity.
  • Utility-scale solar produces electricity during daylight hours; its value to the grid increasingly depends on storage and transmission connections.

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1 80 MW Construction PV 2026
2 33 MW Pre-construction PV 2026

Location

Location is approximate. Imagery © Esri, Maxar, Earthstar Geographics

Frequently asked questions

What is the capacity of Binalonan (Citicore) Solar Power Project?

Binalonan (Citicore) Solar Power Project has a capacity of 113 MW according to the latest Global Energy Monitor data.

Who owns Binalonan (Citicore) Solar Power Project?

Citicore Solar Pangasinan 2 Inc.

Where is Binalonan (Citicore) Solar Power Project located?

It is located in Luzon Island, Philippines. Approximate coordinates: 16.9879, 121.2996.

When is Binalonan (Citicore) Solar Power Project expected to start?

Start year: 2026. Current status: Construction.