Al-Anbar power station is a 1.64 GW oil- and gas-fired power station located in Anbar, Iraq. The facility is currently under construction, with a targeted start date of 2026.

1.64 GWCapacity (all phases)
ConstructionStatus
2026Start year
View on the interactive map →

Overview

Global Energy Monitor tracks 6 units or phases at this site (under construction 1.64 GW).

Technology: gas turbine, combined cycle; fuel: natural gas.

Ownership: Ministry of Electricity (Iraq).

6 further units or phases are scheduled to come online in 2026.

Why it matters

  • The 15th-largest oil- and gas-fired power station in Iraq by capacity (of 102 operating, under-construction and planned oil & gas facilities tracked).
  • If completed, it would add 1.64 GW to Iraq's oil & gas fleet — equivalent to 3.5% of today's operating oil & gas capacity.

Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.

Oil & gas power in Iraq

Iraq has 46.6 GW of operating oil & gas capacity across 83 plants in the Global Energy Monitor dataset — 93% of the country's total operating power capacity of 50.0 GW.

The oil & gas pipeline in Iraq includes 11.5 GW under construction and 23.8 GW at earlier planning stages.

Other major oil & gas plants in Iraq include Besmaya power station (5.00 GW), Al Faw IPP power station (3.00 GW) and New Rumaila power station (2.67 GW).

See the full list: Gas & oil power plants in Iraq →

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
1-GT1 273 MW Construction gas turbine 2026
1-GT2 273 MW Construction gas turbine 2026
1-ST1 275 MW Construction combined cycle 2026
2-GT1 273 MW Construction combined cycle 2026
2-GT2 273 MW Construction combined cycle 2026
2-ST1 275 MW Construction combined cycle 2026

How gas & oil power plants work

Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.

Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.

Technology at Al-Anbar power station

Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.

Location

Imagery © Esri, Maxar, Earthstar Geographics

Al-Anbar power station is located in Anbar, Iraq, at approximately 33.5340, 43.0234. Open the interactive map to explore nearby power plants, high-voltage lines and substations.

Ownership

Al-Anbar power station is owned by Ministry of Electricity (Iraq). Across the dataset, Ministry of Electricity (Iraq) is linked to 92 power plants with 29.2 GW of operating capacity.

Frequently asked questions

What is the capacity of Al-Anbar power station?

Al-Anbar power station has a capacity of 1.64 GW according to the latest Global Energy Monitor data. This figure covers the 6 units or phases listed for the site.

What type of facility is Al-Anbar power station?

Al-Anbar power station is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.

Who owns Al-Anbar power station?

Al-Anbar power station is owned by Ministry of Electricity (Iraq).

Where is Al-Anbar power station located?

It is located in Anbar, Iraq. Approximate coordinates: 33.5340, 43.0234.

Is Al-Anbar power station operational?

According to the latest data, Al-Anbar power station is under construction. Under construction means physical work has started on site but the facility is not yet in commercial service.

When is Al-Anbar power station expected to start?

Start year: 2026. Current status: Construction. 6 further units or phases are scheduled to come online in 2026.

How big is Al-Anbar power station compared with other facilities in Iraq?

Al-Anbar power station ranks #15 by capacity among 102 comparable oil & gas facilities tracked in Iraq.

Nearby energy infrastructure

Other assets of the same owner

Sources and methodology

Source: Global Energy Monitor, Global Integrated Power Tracker, 2026-09 release. Full project profile on GEM.wiki. Last updated: 8 October 2026.

Capacity, status, ownership and unit details come from Global Energy Monitor's public trackers, which are compiled from company reports, government filings and news coverage and updated several times a year. Rankings and shares are calculated by The Daily Energy from the same dataset. Estimated annual generation uses typical capacity factors for each technology and is indicative only.

Data: Global Energy Monitor (GIPT 2026-09, GGIT 2025-11, GOIT 2026-06, GOGET 2026-03, GCMT 2026-08, OSM 2026-10) licensed under CC BY 4.0; transmission grid © OpenStreetMap contributors (ODbL). Compiled and published by The Daily Energy.

Special projects