Solar · United States

AC Ranch solar farm

AC Ranch solar farm is a 305 MW solar power plant located in New Mexico, United States. The facility is currently at the pre-construction stage, with a targeted start date of 2026.

305 MWCapacity (all phases)
Pre-constructionStatus
2026Start year
View on the interactive map →

Overview

GEM tracks 2 units or phases at this site (planned 305 MW).

Technology: PV.

Ownership: Lydian Energy.

Why it matters

  • Utility-scale solar produces electricity during daylight hours; its value to the grid increasingly depends on storage and transmission connections.

Units and phases

Unit / phaseCapacityStatusTechnologyStartRetired
AC1S 75 MW Pre-construction PV 2026
AC2S 230 MW Pre-construction PV 2027

Location

Imagery © Esri, Maxar, Earthstar Geographics

Frequently asked questions

What is the capacity of AC Ranch solar farm?

AC Ranch solar farm has a capacity of 305 MW according to the latest Global Energy Monitor data.

Who owns AC Ranch solar farm?

Lydian Energy.

Where is AC Ranch solar farm located?

It is located in New Mexico, United States. Approximate coordinates: 32.7323, -103.2748.

When is AC Ranch solar farm expected to start?

Start year: 2026. Current status: Pre-construction.