Overview
Global Energy Monitor tracks 5 units or phases at this site (operating 1.52 GW).
Technology: gas turbine, combined cycle; fuel: natural gas, fossil liquids: diesel.
Ownership: Cairo Electricity Production Co (parent company: Egyptian Electricity Holding Co).
Its 5 operating units were commissioned between 2012 and 2019.
Why it matters
- The 10th-largest oil- and gas-fired power station in Egypt by capacity (of 60 operating oil & gas facilities tracked).
- Provides about 2.8% of Egypt's operating oil & gas capacity and roughly 2.4% of all operating power capacity in the country in the dataset.
- At a typical capacity factor of 40% for this technology, it would generate roughly 5.3 TWh of electricity a year (indicative estimate).
Gas-fired plants — especially combined-cycle units — provide flexible output that can ramp quickly to balance demand and variable renewables, so their availability is closely tied to gas supply and prices.
Oil & gas power in Egypt
Egypt has 54.5 GW of operating oil & gas capacity across 60 plants in the Global Energy Monitor dataset — 85% of the country's total operating power capacity of 64.0 GW.
The oil & gas pipeline in Egypt includes 2.55 GW under construction.
Other major oil & gas plants in Egypt include Beni Suef power plant (4.80 GW), Burullus power plant (4.80 GW) and New Capital power station (4.80 GW).
Units and phases
| Unit / phase | Capacity | Status | Technology | Start | Retired |
|---|---|---|---|---|---|
| 1 | 150 MW | gas turbine | 2012 | ||
| 2 | 150 MW | gas turbine | 2012 | ||
| 3 | 150 MW | gas turbine | 2012 | ||
| 4 | 150 MW | gas turbine | 2012 | ||
| CC1 | 919 MW | combined cycle | 2019 |
How gas & oil power plants work
Gas- and oil-fired power plants burn fuel either in a gas turbine, a steam boiler or a reciprocating engine. In a combined-cycle plant the hot exhaust of the gas turbine is used to raise steam for a second, steam-driven turbine, lifting overall efficiency to 55–62%.
Because gas units can start quickly and change output within minutes, they play a central role in balancing electricity systems with growing shares of wind and solar. Their operating costs track fuel prices closely, so gas supply security — via pipelines or LNG — directly affects how often they run. A modern combined-cycle plant emits roughly 0.35–0.4 tonnes of CO₂ per megawatt-hour.
Technology at 6 October power plant
Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant. Open-cycle gas turbines can start within minutes and are mainly used as peaking plants, at efficiencies of roughly 30–40%.
Location
6 October power plant is located in Giza, Egypt, at approximately 30.0538, 31.0464. Open the interactive map to explore nearby power plants, high-voltage lines and substations.
Ownership
6 October power plant is owned by Cairo Electricity Production Co. The ultimate parent company is Egyptian Electricity Holding Co. Across the dataset, Egyptian Electricity Holding Co is linked to 63 power plants with 56.7 GW of operating capacity.
Frequently asked questions
What is the capacity of 6 October power plant?
6 October power plant has a capacity of 1.52 GW according to the latest Global Energy Monitor data. This figure covers the 5 units or phases listed for the site.
What type of facility is 6 October power plant?
6 October power plant is a oil- and gas-fired power station. Combined-cycle units pair gas turbines with a heat-recovery steam generator and steam turbine, reaching efficiencies of 55–62% — the highest of any thermal power plant.
Who owns 6 October power plant?
6 October power plant is owned by Cairo Electricity Production Co. The ultimate parent company is Egyptian Electricity Holding Co.
Where is 6 October power plant located?
It is located in Giza, Egypt. Approximate coordinates: 30.0538, 31.0464.
Is 6 October power plant operational?
According to the latest data, 6 October power plant is in operation. Operating means the facility is built and in commercial service.
When did 6 October power plant start operating?
Start year: 2012. Current status: Operating. Its 5 operating units were commissioned between 2012 and 2019.
How much electricity does 6 October power plant generate?
Actual output data are not published for every plant. As an indicative estimate, 6 October power plant would produce about 5.3 TWh a year, assuming a capacity factor of 40%, which is typical for this technology.
How big is 6 October power plant compared with other facilities in Egypt?
6 October power plant ranks #10 by capacity among 60 comparable oil & gas facilities tracked in Egypt.