Overview
Discovered in 1951, production start in 1951.
Latest reported production: 0.14 million boe/y (2022), covering gas.
Why it matters
- Upstream fields are the starting point of the oil and gas value chain; production profiles determine pipeline, LNG and refinery utilisation downstream.
Location
Frequently asked questions
What is the capacity of Itterbeck-Halle/Getelo (Karbon) Gas Field (Germany)?
Itterbeck-Halle/Getelo (Karbon) Gas Field (Germany) has a capacity of 0.14 million boe/y according to the latest Global Energy Monitor data.
Where is Itterbeck-Halle/Getelo (Karbon) Gas Field (Germany) located?
It is located in Germany. Approximate coordinates: 52.4564, 6.8900.
When did Itterbeck-Halle/Getelo (Karbon) Gas Field (Germany) start operating?
Start year: 1951. Current status: Operating.