Overview
It has a reported design capacity of 1.70 bcm/y and a mapped route of roughly 86 km.
Ownership: Bulgartransgaz (parent company: Bulgarian Energy Holding EAD).
Why it matters
- The 6th-largest natural gas pipeline in Bulgaria by capacity (of 23 operating gas pipeline facilities tracked).
- Transmission pipelines move gas from production areas and LNG terminals to power plants, industry and city networks; their capacity and routing shape regional supply security.
Location
Frequently asked questions
What is the capacity of Lozenets–Nedyalsko Loop Gas Pipeline?
Lozenets–Nedyalsko Loop Gas Pipeline has a capacity of 1.70 bcm/y according to the latest Global Energy Monitor data.
Who owns Lozenets–Nedyalsko Loop Gas Pipeline?
Bulgartransgaz — parent company: Bulgarian Energy Holding EAD.
Where is Lozenets–Nedyalsko Loop Gas Pipeline located?
The pipeline runs through Bulgaria.
When did Lozenets–Nedyalsko Loop Gas Pipeline start operating?
Start year: 2018. Current status: Operating.