Hydropower plants in Tunisia
This list ranks all 2 hydropower plants tracked in Tunisia by capacity, including operating, under-construction, planned, shelved and retired projects. 1 of them are operating, with a combined capacity of 25 MW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Tabarka hydroelectric plantJendouba Governorate | Hydropower | 400 MW | Pre-construction | 2029 |
| 2 | Sidi Salem hydroelectric plantBéja | Hydropower | 25 MW | 1983 |