Country profile
Timor-Leste energy infrastructure
Global Energy Monitor tracks 8 energy facilities in Timor-Leste, including power plants with 255 MW of operating generating capacity.
Timor-Leste's energy system at a glance
Timor-Leste has 255 MW of operating power generation capacity across 2 plants in the Global Energy Monitor dataset. Oil & gas is the largest source, with 255 MW or 100% of the total.
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 0% of operating capacity, while coal, oil and gas account for 100%. Wind and solar alone represent 0%.
Another 122 MW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 1 LNG terminals and 2 oil and gas fields (1 producing) in Timor-Leste.
Operating power capacity by technology
- Oil & gas 255 MW 100%
Largest power plants in Timor-Leste
| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Betano power stationManufahi | Oil & gas | 136 MW | 2013 | |
| 2 | Hera power stationDíli | Oil & gas | 119 MW | 2012 | |
| 3 | Manatuto solar farm | Solar | 72 MW | Announced | |
| 4 | Lariguto wind farmLariguto | Wind | 50 MW | Announced |
Pipeline: capacity under construction
Gas & oil power plants in Timor-Leste
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Betano power stationManufahi | Oil & gas | 136 MW | 2013 | |
| 2 | Hera power stationDíli | Oil & gas | 119 MW | 2012 |
Wind farms in Timor-Leste
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Lariguto wind farmLariguto | Wind | 50 MW | Announced |
Solar farms in Timor-Leste
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Manatuto solar farm | Solar | 72 MW | Announced |
LNG terminals in Timor-Leste
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Sunrise FLNG TerminalAustralia and East Timor | LNG export terminal | Proposed |
Oil & gas fields in Timor-Leste
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Bayu Undan Oil and Gas Field (Timor-Leste) | Oil & gas field | 2004 | ||
| 2 | Buffalo Redevelopment Oil Field (Timor-Leste) | Oil & gas field | Mothballed | 1999 |
Frequently asked questions
How much power generation capacity does Timor-Leste have?
Global Energy Monitor tracks 255 MW of operating power plant capacity in Timor-Leste, counting plants of all technologies above the trackers' size thresholds.
What share of Timor-Leste's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 0% of operating power capacity in Timor-Leste. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does Timor-Leste have nuclear power plants?
No operating nuclear power plant is recorded in Timor-Leste in the dataset.
Does Timor-Leste have LNG terminals?
Yes. The dataset lists 1 LNG terminal projects in Timor-Leste.