LNG terminals in Thailand
This list ranks all 4 lng terminals tracked in Thailand by capacity, including operating, under-construction, planned, shelved and retired projects. 2 of them are operating, with a combined capacity of 19.0 mtpa.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Map Ta Phut LNG Terminal 1Rayong | LNG import terminal | 11.5 mtpa | 2011 | |
| 2 | Map Ta Phut LNG Terminal 3 | LNG import terminal | 10.8 mtpa | Proposed | |
| 3 | Map Ta Phut LNG Terminal 2Rayong | LNG import terminal | 7.50 mtpa | 2023 | |
| 4 | Surat Thani FSRUSurat Thani | LNG import terminal | 5.00 mtpa | Shelved |