Gas pipelines in Tajikistan
This list ranks all 2 gas pipelines tracked in Tajikistan by capacity, including operating, under-construction, planned, shelved and retired projects.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Central Asia–China Gas Pipeline | Gas pipeline | 30.0 bcm/y | Shelved | 2022 |
| 2 | Kelif-Dushanbe Gas Pipeline | Gas pipeline | 1975 |