Gas pipelines in Spain (page 2)
This list ranks all 57 gas pipelines tracked in Spain by capacity, including operating, under-construction, planned, shelved and retired projects. 51 of them are operating, with a combined capacity of 29.2 bcm/y.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 51 | Vergara-Irun Gas Pipeline | Gas pipeline | 1984 | ||
| 52 | Villapresente-Burgos Gas Pipeline | Gas pipeline | 1988 | ||
| 53 | Villapresente–Oviedo Gas Pipeline | Gas pipeline | |||
| 54 | Villar de Arnedo–Haro Gas Pipeline | Gas pipeline | 1979 | ||
| 55 | Yela–Villar de Arnedo Gas Pipeline | Gas pipeline | 2012 | ||
| 56 | Zamora–Valladolid Gas Pipeline | Gas pipeline | 1990 | ||
| 57 | Zaragoza–Serrablo Gas Pipeline | Gas pipeline | 1983 |